WardProject NameActivitiesObjectivesStart DateEnd DateEstim ated CostActual Cumulative Expenditure%Implemen tation StatusRemarks
Moi's BridgeMoi's Bridge Primary/Tuiyobe iEquippingTo increase access to potable water and sanitation servicesJuly 2024June 20254,900 ,0000OngoingBorehole drilling done in phase 1; Foundation for installation of steel water tank was done; Remaining works include construction of elevated steel stand, installation of solar, tanks and distribution among other works
Moi's BridgeKatutwet water projectDrilling, equipping & DistributionTo increase access to potable water and sanitation servicesJuly 2024June 20255,000 ,0000OngoingDrilling of borehole, installation of 24,000l steel water tank was complete; Construction of solar stand was ongoing; Remaining works included supply of solar panels, distribution, construction of community water points among other works
Moi's BridgeKilima; Upper Mogoon, Moi's Bridge Town Water ProjectsRehabilitati on/constru ction and distribution of waterTo increase access to potable water and sanitation servicesJuly 2024June 202515,00 0,0000Preprocureme ntThe project had not started and was at design Stage
Moi's BridgeNzoia River riparian land conservation projectConservati on of water resource and supply of 650, 1.5meter high tree seedlingsTo enhance environment al conservationJuly 2024Dec 20241,400 ,0001,254,00 089 .6Complete dSupply and planting of 650, 1.5m high tree seedlings was completed along Nzoia river; Indigenous trees included to conserve the riparian land;
Moi's BridgeMoi’s Bridge poultry farmingProvision of 4 solar powered incubators and 1200day old chicks to women and youth groupsTo enhance sustainable food productionJuly 2024Dec 20241,500 ,00000Procurem entProcurement of powered incubators still in the processing
Moi's BridgeMoi’s Bridge school rain water harvesting projectInstallation of ten 10M³ tanks, gutters and pumpsTo increase access to potable waterJuly 2024Dec 20243,200 ,0003,200,00 010 0Procurem entThe installation of water tank, gutters and pumps had not started
Moi's BridgeDrainage Improvement of Meto - Natwana, Moiben - Kilima- SDA, Katutwet - Tegeiyat, Bwayi, Sironoi -Pendatoto, Sironoi dip- Chebarus, MajimazuriMukunga, Jabali dip-Baghdad - Point mbili Roads in Moi's Bridge WardDrainage Improveme ntImprove road and transport connectivity3,500 ,0003,500,00 0Ongoing8 lines of (600mm) culverts installed along KwenetSolo road, Kilima-Moiben river road, Jabali-Kongasis road and Kapkatet-Tuiyobei dip road; Routine drainage to avoid blockage and backfilling of culverts was done
Moi's BridgeProposed installation of flood light behind Moi's Bridge Police Station in Moi's Bridge WardInstallation of streetlightsTo enhance access to clean and affordable energy3,000 ,0002,999,95 6.33OngoingConstruction of foundation for the flash light was done; Remaining works included installation of mask and floodlights
Moi's BridgePurchase & Installation of street light spares -across Moi's Bridge WardInstallation of streetlightsTo enhance access to clean and affordable energy2,000 ,0002,000,00 0Complete dSupply and installation of street lights spares was complete;
Moi's BridgeConstruction of Cluster 3 Ward OfficesConstructio n of Kapkures, Kipsomba, Tapsagoi,Huruma and MoisbridgeTo create efficiency and effectiveness in public serviceFeb 2022June 2023140,5 73,10 9.7020,651,4 2015OngoingMain building constructed and roofed; Remaining works included fixing of ceiling, fixing of doors, painting, civil works among others; Construction of the office is at a slow pace and the project is beyond contract period of June 2023
Moi's BridgeHire of Machines- Grading & Gravelling Bwayi - Elare - Mois Bridge- Kambi Amani - Kapkatet in Moi's bridge WardGrading and GravellingImprove road and transport connectivity3,500 ,000. 00-Pre- Procurem entThe project had not started and was at design stage
Moi's BridgeGravelling of Excullen- Kilima in Moi's bridge WardGrading and GravellingImprove road and transport connectivity3,500 ,000. 00-Pre- Procurem entThe project had not started and was at design stage
Moi's BridgeConstruction of Culverts of Excullen- Kilima in Moi's bridge WardDrainage Improveme ntImprove road and transport connectivity1,075 ,113. 00-Pre- Procurem entThe project had not started and was at design stage
SoySoy Health CentreRenovation worksTo increase access to quality preventive and promotive healthJuly 2023June 20242,200,0 002,200,00010 0CompleteLaying of floor tiles, replacement of ceiling and painting of the facility was complete; Renovation of Comprehensive Care Unit (Ampath) and staff quarters was recommended; The facility provides access to primary healthcare for 200 HH in the area
SoySinonin DispensaryConstructio n of drug storeTo increase access to quality preventive and promotive healthJuly 2024June 20251,000,0 0--OngoingConstruction of building was at roofing stage; Door and window grills fixed; Pending works included painting; fixing of ceiling among other works; Renovation of staff quarters was recommended
SoyConstruction of boda boda Shades at Soy- Kipsangui Junction in Soy WardConstructio n of boda boda shadesImprove road and transport connectivityJuly 2024June 2025500,00 0.00500,000ProcurementConstruction of boda boda shades at procurement stage
SoyProposed installation and maximization of Transformer at Milimani, Kapkongony,Kesogon in Soy WardInstallation of streetlightsTo enhance access to clean and affordable energyJuly 2024June 20253,200,0 00.003,200,000Yet to startTender was awarded and awaiting delivery of transformers
SoyConstruction of slaughter slabConstructio n of slaughter slabTo increase livestock productionJuly 2024June 20251,000,0 0000Pre- ProcurementBQ done but tender not awarded
SoyKaptait- Kapchepkwony water project, Kap-surur damDistribution worksTo increase access to potable water and sanitation servicesJuly 2024June 202515,000, 00000Pre- ProcurementDistribution of water at Kap-surur dam at design stage
SoyKapchepkwony / Kaptait DamdistributionTo increase access to potable water and sanitation servicesJuly 2024June 2025-00ProcurementDistribution of water at Kapchepkwony/ Kaptait dam was at procurement stage
SoyKapchunga Dam - Distributed to Lorwa, Simit, NyaruDistributionTo increase access to potable water and sanitation servicesJuly 2024June 20252,000,0 0000Pre- ProcurementDistribution of water at Kapchunga dam was at design stage
SoyKipsangui Farm distributionDistributionTo increase access to potable water and sanitation servicesJuly 2024June 20252,000,0 0000Pre- ProcurementDistribution of water at Kipsangui farm was at design stage
SoyNgoisa Kabenes distributionDistributionTo increase access to potable water and sanitation servicesJuly 2024June 20252,000,0 0000Pre- ProcurementDistribution of water at Ngoisa Kabenes was at design stage
SoyKabenes centre and surroundingsDrainage systemTo improve infrastructureJuly 2024Dec 20243,100,0 003,046,91498ongoingThe project was funded by World Bank through the FLLOCA programme; Removal of soil excavated from the trenches recommended Trenches dug to assist in draining water during rainy season and avoid flooding at Kabenes centre and its surroundings;
SoySoy pasture enhancement projectProvision of Boma Rhodes and fodder sorghumTo enhance environmental conservationJuly 2024Dec 20242,000,0 002,000,00010 0ProcurementProcurement stage
SoyBudalangi Keith ECDEConstructio n of classroomImprove access to ECDESep 2024June 2025800,00 0800,0000ProcurementRequisition on process
SoyCPU ECDEConstructio n of classroomImprove access to ECDESep 2024June 2025800,00 0800,0000ProcurementRequisition on process
SoyKesogon ECDEConstructio n of classroomImprove access to ECDESep 2024June 2025800,00 0800,0000ProcurementRequisition on process
SoyConstruction/ Rehabilitation of Cattle dipsControl of Pest and parasiteborne diseasesConstructio n of cattle dips; Training of dip committeesTo increase livestock productionJuly 2024June 202520,850, 00020,850,0000ProcurementBQ in progress (for FY 2022/23 and 2023/24)
SoyHire of Machinery- Grading and Gravelling Cherungut - Ngobitwa roads in Soy WardGrading and GravellingImprove road and transport connectivity2,475,1 13.00-Complete5km of road graded and gravelled under the hire of Machinery; Culverts needed to improve drainage in some parts of the road; The road provided access to markets for farm and livestock produce
SoyDrainage improvement of Rimoi, Budalangi, Kenyeloi roads in Soy WardDrainage Improveme ntImprove road and transport connectivity2,500,0 00.00-Pre- ProcurementThe project had not started and was at design stage
SoyFuel for Development works in Soy WardGrading and GravellingImprove road and transport connectivity2,000,0 00.00-Pre- ProcurementThe project had not started and was at design stage
SoyHire of Machinery- Grading and Gravelling Cherungut - Ngobitwa Rds in Soy WardGrading and GravellingImprove road and transport connectivity2,475,1 13.00-Pre- ProcurementThe project had not started and was at design stage
SoyDrainage improvement of Rimoi, Budalangi, Kenyeloi Rds in Soy WardDrainage Improveme ntImprove road and transport connectivity2,500,0 00.00-Pre- ProcurementThe project had not started and was at design stage
SoyFuel for Development works in Soy WardGrading and GravellingImprove road and transport connectivity2,000,0 00.00-Pre- ProcurementThe project had not started and was at design stage
Kuinet/KapsuswaOlare Water ProjectEquipping and distributionTo increase access to potable water and sanitation servicesJuly 2024June 202515,000, 0000Pre- ProcurementThe project had not started and was at design stage
Kuinet/KapsuswaKapindaniSolar pumping, storage tank and distributionTo increase access to potable water and sanitation servicesJuly 2024June 20250-Pre- ProcurementThe project had not started and was at design stage
Kuinet/KapsuswaMikwenTo increase access to potable water and sanitation servicesJuly 2024June 20250-Pre- ProcurementThe project had not started and was at design stage
Kuinet/KapsuswaExtension of Water Within MunicipalityDistributionTo increase access to potable water and sanitation servicesJuly 2024June 20252,600,0 0000Pre- ProcurementThe project had not started and was at design stage
Kuinet/KapsuswaTamboiyot Water ProjectDistributionTo increase access to potable water and sanitation servicesJuly 2024June 20252,600,0 0000Pre- ProcurementThe project had not started and was at design stage
Kuinet/KapsuswaGreen field primary school drainage projectEarthwork, grading, gravelling and making culverts on a 1.5 Km road stretchTo improve infrastructureJuly 2024Dec 20243,500,0 003,575,000102ProcurementProcurement stage
Kuinet/KapsuswaKaptigin water projectElevate 24M³ steel tank and 700 m distribution lineTo increase access to potable waterJuly 2024Dec 20241,650,0 0000Yet to startExisting water project; No works done on the site
Kuinet/KapsuswaRorok ECDEConstruction of Ablution BlocksImprove sanitation in ECDESep 2024June 2025400,00 0400,0000ProcurementTendering process ongoing
Kuinet/KapsuswaKapchan ECDEConstruction of Ablution BlocksImprove sanitation in ECDESep 2024June 2025400,00 0400,0000ProcurementTendering process ongoing
Kuinet/KapsuswaAirstripConstruction of Ablution BlocksImprove sanitation in ECDESep 2024June 2025400,00 0400,0000ProcurementTendering process ongoing
Kuinet/KapsuswaGreen fields ECDEConstruction of Ablution BlocksImprove sanitationSep 2024June 2025400,00 0400,0000ProcurementTendering process ongoing
Kuinet/KapsuswaRehabilitation of Eldoret main slaughter houseRehabilitation of Eldoret main slaughterhous eTo increase livestock productionJul-24Jun- 252,027,0 00Nil0Yet to startTender awarded but Constructor deferred to September 2024
Kuinet/KapsuswaPurchase of pigsIdentification of beneficiaries; Procurement and distribution of pigs; Conduct farmers' trainingsTo increase livestock productionJuly 2024June 2025500,00 0500,0000CompletedThe programme was funded by World Bank through FLLoCA programme; Distribution of 4 pigs done to xx groups;
Kuinet/KapsuswaPurchase of incubatorsProcurement and distribution of Hybridization ovens or incubatorsTo increase livestock productionJuly 2024June 2025500,00 000Pre- ProcurementRequest for quotation done
Kuinet/KapsuswaPond LinersProcurement and distribution of pond liners to fish farmer groupsTo increase livestock productionJuly 2024June 2025500,00 0499,9950CompletedThe programme was funded by World Bank through FLLoCA programme; Distribution of pond liners(10*20m) was completed with 8 groups benefiting; Sampled Chepsiria Self Help Group with 17 members and Kemcara group with 10 members; The fish ponds will improve income streams of the farmers and create employment
Kuinet/KapsuswaProcurement and installation of Kitchen gardensProcurement and distribution of kitchen gardens to farmer groupsTo increase livestock productionJuly 2024June 2025300,00 0298,0000CompletedThe project was funded by World Bank through the FLLOCA programme; Delivery of kitchen gardens to 10 groups completed; Sampled Bandaptai Kapchan women group with 10 members; The project was able to substitute income and create employment to group members thus improving their living standards
Kuinet/KapsuswaFuel for development for Kuinet/ Kapsuswa WardGrading and GravellingImprove road and transport connectivity1,200,0 00--ProcurementFuel in requisition stage
Kuinet/KapsuswaPurchase & installation of street light spares across Kuinet/ Kapsuswa WardInstallation of streetlightsTo enhance access to clean and affordable energyJune 2024Sept 20241,500,0 00.001,500,000.0010 0CompletedStreet lights were installed across Kuinet/ Kapsuswa ward; The lights helped reduce insecurity in areas installed
Kuinet/KapsuswaConstruction and upgrading of roads, installation of culverts and Drainage openings, tarmacking of roads and streetlighting- Kamkunji - Kibulgeny - Marakwet, Kamkunji - Bondeni, Itigo - Chepsiria - Mti Moja Kapkius - Shirika Road in Kuinet/Kapsus wa WardGrading and GravellingImprove road and transport connectivity11,475, 113ProcurementProjects yet to start
Kuinet/KapsuswaFuel for Development works in Kuinet/Kapsus wa WardGrading and GravellingImprove road and transport connectivity1,500,0 00.00-Pre- ProcurementThe project had not started and was at design stage
Kuinet/KapsuswaConstruction of boda boda shades at Three Shades within Kuinet /Construction of boda boda shadesImprove road and transport connectivity900,00 0.00-Pre- ProcurementThe project had not started and was at design stage
Kuinet/KapsuswaRoad lighting- Itigo-Sogomo, Koitebes, Umoja, Green fields, Bondeni- Kambiteso block Ten/ Subaru in Kuinet/Kapsus waInstallation of streetlightsTo enhance access to clean and affordable energy4,000,0 00.00-Pre- ProcurementThe project had not started and was at design stage
Segero/BarsombeChebalal dam water project; Lingwai water project; Chepkoiyo water project; Kaplamai water project; Koisagat water projectDistribution of waterTo increase access to potable water and sanitation servicesJuly 2024June 202515,000,0000-Pre- ProcurementThe project had not started and was at design stage
Segero/BarsombeChelabal damSolar pumping, storage tank and distributionTo increase access to potable water and sanitation servicesJuly 2024June 20250-Pre- ProcurementThe project had not started and was at design stage
Segero/BarsombeKuresiet / Chinese Water projectDrilling and equipping with solar panelsTo increase access to potable water and sanitation servicesJuly 2024June 20253,000,00000Pre- ProcurementThe project had not started and was at design stage
Segero/BarsombeTekeiyat water projectDrilling and equipping with solar panelsTo increase access to potable water and sanitation servicesJuly 2024June 20253,600,00000Pre- ProcurementThe project had not started and was at design stage
Segero/BarsombeEmkwen water projectDrilling and equipping with solar panelsTo increase access to potable water and sanitation servicesJuly 2024June 20253,600,00000Pre- ProcurementThe project had not started and was at design stage
Segero/BarsombeKapngetuny water projectDrilling and equipping with solar panelsTo increase access to potable water and sanitation servicesJuly 2024June 20252,500,00000OngoingConstruction of pump house and sump was done; Pending works included installation of Solar panels, construction of tank and laying of distribution lines; Once completed, the project will serve Kapng’etuny pri, Kapng’etuny sec, Kibagenge dispensary and 200 HHs
Segero/BarsombeSegero centre water projectDrilling and equipping with solar panelsTo increase access to potable water and sanitation servicesJuly 2024June 20252,500,00000OngoingConcrete 100,000litres tank constructed; Ongoing works included construction of sump which was dug; Pending works include construction of solar stand, supply and installation of solar, construction of pump house among other works
Segero/BarsombeSegero Moiben water project5.5Km distribution lineTo increase access to potable waterJuly 2024Dec 20245,000,0005,000,000100OngoingSolar panels installed, sump and pump house constructed, 2km of intake pipes laid and project was fenced; There was existing concrete 100,000 litres water tank;
Segero/BarsombeKapngetuny ECDECompletion of ClassroomImprove access to ECDESep 2024June 2025500,000500,0000ProcurementRequisition on process
Segero/BarsombeBarsombe ECDECompletion of ClassroomImprove access to ECDESep 2024June 2025500,000500,0000ProcurementRequisition on process
Segero/BarsombeSt, Thomas ECDECompletion of ClassroomImprove access to ECDESep 2024June 2025500,000500,0000ProcurementRequisition on process
Segero/BarsombeRoret ECDECompletion of ClassroomImprove access to ECDESep 2024June 2025500,000500,0000ProcurementRequisition on process
Segero/BarsombeHire Of Equipment For Construction Of Sugutek - Kaptich, Kapkiplel - Cheukta Roads In Segero/ Barsombe WardGrading and GravellingImprove road and transport connectivity3,302,318. 003,302,318. 00Ongoing2.5km of Sugutek- Kaptich road was graded and gravelled under hire of equipment; 1.1km of Kapkilel-Cheukta road was graded and gravelled;The road links Ngeny- corner road and Ng’eny - Cheukta road
Segero/BarsombeConstruction of Box Culvert at Tuiyobei Dip – BondeniGrading and GravellingImprove road and transport connectivity5,000,000. 005,000,000. 00ProcurementProcurement stage
Segero/BarsombeBoda boda Shades Kapsabul, Bronjo, SegeroConstruction of Boda Boda shadesImprove road and transport connectivity1,500,000. 001,500,000. 00ProcurementProcurement stage
Segero/BarsombeBarsombe – St. Peters Box CulvertDrainage ImprovementImprove road and transport connectivity5,000,000. 004,997,256. 80OngoingBox culverts was constructed with 2 side culverts also completed; Pending works included backfilling; The box culvert links Barsombe centre to Kapsabul dispensary
Segero/BarsombeHire of machines and Gravelling- Barsombe - Koisagat, Kiborokwa dip Sinonin road, kapngetuny- Tenai road and Kanus - Toror RoadGrading and GravellingImprove road and transport connectivity8,075,113. 00-Pre- ProcurementThe project had not started and was at design stage
Segero/BarsombeDrainage Works acrossDrainage ImprovementImprove road and transport connectivity2,000,000. 00-Pre- ProcurementThe project had not started and was at design stage
Segero/BarsombeConstruction of Sigowet Dip- Sinonin Box culvertDrainage ImprovementImprove road and transport connectivity5,000,000. 00-Pre- ProcurementThe project had not started and was at design stage
Segero/BarsombeConstruction of boda boda shades at Bakule centre, Corner centre and Kuresiet centreConstruction of Boda Boda shadesImprove road and transport connectivity1,500,000. 00-Pre- ProcurementThe project had not started and was at design stage
ZiwaZiwa level V Phase IIConstruction of sections of ground, 1st, 2nd and 3rdfloor, slabs, columns Ramps and roofing,To improve access to curative and rehabilitative servicesJan 2020Dec- 23 Exten sion reque sted806,56 2,179328,844,84041OngoingConstruction of sections of ground, 1st, 2nd and 3rd floor, slabs, columns, ramps done; Remaining works included plastering, painting among other finishing works; Slow progress was occasioned by delayed release of funds to the project.
ZiwaZiwa level V Phase IIIConstruction of chapel, kitchen, mortuary, laundry, boundary wall and equippingTo improve access to curative and rehabilitative servicesFeb 2022Jul-23 Exten sion reque sted415,31 7,248147,068,40835ongoingConstruction of chapel, kitchen, laundry roofed; Remaining works included fixing of doors, painting among other finishing works; Slow progress of work was occasioned by delay in release of funds to the project
ZiwaConstruct ion and completio n of Theatre block and postnatal block at Ziwa Sub County HospitalConstruction and completion of Theatre block and postnatal block at Ziwa Sub County HospitalTo improve access to curative and rehabilitative servicesMay 2023Dec- 23 Exten ded to Oct 202414,599, 63512,696,67587OngoingCompletion of main structure was ongoing with painting, connection of electricity, fixing of tiles and ceiling done; Fixing of oxygen deliver points was completed; Remaining works included equipping with surgical tables, surgical lamps, anesthesia machines and monitoring devices among other equipment
ZiwaLegebet Dispensa ryConstruction of Health facilityTo increase access to quality preventive and promotive healthJuly 2023June 20242,400,0 0000Procure mentAwarded awaiting contract
ZiwaLemoru Trinity Dispensa ryCompletion of Maternity & Septic tankTo increase access to quality preventive and promotive healthJuly 2023June 20242,600,0 0000OngoingSeptic tank construction was complete; Completion of maternity was ongoing with painting, electrical wiring, installation of water taps, fixing of toilet tiles and installation of drawers done
ZiwaKipsigak Dispensa ryConstruction of staff housesTo increase access to quality preventive and promotive healthJuly 2023June 20242,200,0 0000ongoingConstruction of 2 one- bedroom staff houses was ongoing with finishing of the houses done; Pending works included installation of electricity metres, construction of sewage lines, connection of water to the houses. Installation of sinks and equipping of toilets; Recommendation for renovations of existing staff houses and construction of septic tank
ZiwaKabobo Dispensa ryRenovation of staff houses and ablution blockTo increase access to quality preventive and promotive healthJuly 2023June 20243,200,0 0000ongoingRenovation works included painting, fixing of floor and bathroom wall tiles, Remaining works included fixing of steel doors, installation of toilet systems and replacement of broken window panes.
ZiwaZiwa Machine water projectConstruction of a tank and distributionTo increase access to potable water and sanitation servicesJuly 2024June 202531,198, 44017,500,000.0 0Complete160,000 litres steel water tank was installed; Water kiosk with emergency horse pipe installed; Installation of additional water kiosks and additional distribution was recommended; At optimal distribution the project would serve 2000 HH The water from the project is used for domestic use and irrigation
ZiwaSakamwe tConstruction of water panTo increase access to potable water and sanitation servicesJuly 2023June 20243,500,0 0000PreProcure mentThe project had not started and was at design stage
ZiwaSaniak water projectDam distillation and water distributionTo increase access to potable water and sanitation servicesJuly 2024June 202515,000, 0000-PreProcure mentThe project had not started and was at design stage
ZiwaCherungu t water project
ZiwaZiwa Machine water ProjectWater storage, water distribution,To increase access to potable water and sanitation servicesJuly 2024June 20250-PreProcure mentThe project had not started and was at design stage
ZiwaKipsigak/ Kapmare Water ProjectWater storage, water distribution,To increase access to potable water and sanitation servicesJuly 2024June 2025131,00 0,0000-PreProcure mentThe project had not started and was at design stage
ZiwaMafuta Water ProjectEquipping of boreholes & DistributionTo increase access to potable water and sanitation servicesJuly 2024June 20254,800,0 0000PreProcure mentThe project had not started and was at design stage
ZiwaSaniak Water ProjectEquipping of boreholes & DistributionTo increase access to potable water and sanitation servicesJuly 2024June 20254,800,0 0000PreProcure mentThe project had not started and was at design stage
ZiwaKapkatetDrillingTo increase access to potable water and sanitation servicesJuly 2024June 2025600,00 000PreProcure mentThe project had not started and was at design stage
ZiwaKapchero rDrillingTo increase access to potable water and sanitation servicesJuly 2024June 2025600,00 000PreProcure mentThe project had not started and was at design stage
ZiwaJuly 2024Dec 20242,100,0 002,030,00096.6 7ongoingExisting water project with borehole dug, equipped and water tank installed;
ZiwaSachang wan water distributio n project1.5Km distribution lineTo increase access to potable waterJuly 2024Dec 20241,800,0 001,800,000100Procure mentThe project had not started and was still at procurement stage
ZiwaLamaywe t wetlandSurveying and Fencing 1250m perimeter and 150 tree seedlings to be planted for conservationTo enhance environmental conservationJuly 2024Dec 20242,300,0 002,200,00095.6 5completeSurveying and fencing of the wetland were complete with tree seedlings planted; However, poles were not properly fixed, concrete not used to secure the wire mesh fence on the ground; There was need to engage the local community to avoid trespassing into the wetland by destroying the fence
ZiwaKipyigei ECDECompletion of ClassroomImprove access to ECDESep 2024June 2025775,00 0775,0000Procure mentTendering process was ongoing
ZiwaKipkeikei ECDECompletion of ClassroomImprove Sanitation in ECDESep 2024June 2025800,00 0800,0000Procure mentTendering process was ongoing
ZiwaEmdit ECDECompletion of ClassroomImprove access to ECDESep 2024June 2025800,00 0800,0000Procure mentTendering process was ongoing
ZiwaTamboiyo t ECDECompletion of ClassroomImprove access to ECDESep 2024June 2025300,00 0300,0000Procure mentTendering process was ongoing
ZiwaSirikwa ECDECompletion of ClassroomImprove access to ECDESep 2024June 2025300,00 0300,0000Procure mentTendering process was ongoing
ZiwaChebinyi ny ECDECompletion of ToiletImprove Sanitation in ECDESep 2024June 2025200,00 0200,0000Procure mentTendering process was ongoing
ZiwaKimolwet ECDECompletion of ToiletImprove sanitation in ECDESep 2024June 2025200,00 0200,0000Procure mentTendering process was ongoing
ZiwaConstruct ion of millerConstruction and equippingTo promote value addition maizeJuly 2024June 2025110,00 0,00000PreProcure mentBQs being prepared
ZiwaNukiat/Ke buro RoadGrading and GravellingImprove road and transport connectivity7,100,0 00.00--PreProcure mentThe project had not started and was at design stage
ZiwaCulvert at SDA CentralGrading and GravellingImprove road and transport connectivity1,500,0 00.00--PreProcure mentThe project had not started and was at design stage
ZiwaProposed constructi on of Ziwa Machine - Cheplelai bei BridgeDrainage ImprovementImprove road and transport connectivity12,000, 000.00--PreProcure mentThe project had not started and was at design stage
ZiwaConstruct ion of Kambugu Box CulvertDrainage ImprovementImprove road and transport connectivity4,000,1 13.00--PreProcure mentThe project had not started and was at design stage
KipsombaMobet damEquipping & distributionTo increase access to potable waterJuly 2024June 2025PreprocurementYet to start. At design stage
KipsombaTarakwa W/PRehabilitation and distribution worksTo increase access to potable waterJuly 2023Jun 20242,000,000--OngoingRehabilitation and distribution work ongoing
KipsombaTarakwa Health centreConstruction new staff houseTo increase access to quality preventive and promotive healthJuly 2023June 20243,000,00000Yet to startConstruction new staff house is yet to start
KipsombaChemoset DispensaryCompletionTo increase access to quality preventive and promotive healthJuly 2023June 20241,500,000Yet to startProject yet to start
KipsombaKapsumbeiywe t W/PExpansion and distributionTo increase access to potable waterJuly 2024June 20251,000,000--OngoingLaying of pipes underway with 3 water points constructed Project to serve Soin, Tarakwa & Kapkatet communities, & Kapsumbeiywet centre
KipsombaConstruction of Cluster 3 Ward Offices - KipsombaConstruction of Kapkures, Kipsomba, Tapsagoi, Huruma and MoisbridgeTo create efficiency and effectiveness in public serviceFeb 2022June 2023140,573,109. 7020,651,4 2015OngoingDone up to roof level; fencing in progress
KipsombaMobet damEquipping, storage tank and distributionTo increase access to potable waterJuly 2024June 2025---Yet to startProject yet to start.
KipsombaHire of construction equipment for Grading and Gravelling various Roads in Kipsomba WardGrading and GravellingImprove road and transport connectivityJuly 2024June 202510,396,113.0 0--Ongoing4KM of Kipsomba- Chemoset Rd done
KipsombaUpgrading of playfields - Kipsomba Primary School)Levelling of playfield, installation of playfield, landscapingTo promote sports developmentJuly 2023June 20241,200,0001,193,70 099.5completeLeveling of Kipsomba Pry playing field done
KapkuresConstructi on of cluster 3 ward officesKapkures, Kipsomba, Tapsagoi, Huruma and Moi’s bridgeConstructio n of Kapkures, Kipsomba, Tapsagoi, Huruma and Moi’s bridgeTo transform the quality and enhance public service deliveryFeb, 2022Jun, 2023140,573,1 09.7020,651,4 2015OngoingSite excavated for the foundation; Pending works were: Pouring and curing the concrete foundation; Erecting walls, columns, and beams; Installing electrical wiring, and plumbing
KapkuresSisal water projectKapkuresEquipping, constructio n, renovation of water/ distribution worksTo increase access to potable water and sanitation servicesJuly 2024June 202515,000,00 00-Design stageNo works done; The project aimed to equip and renovate it with necessary infrastructure to provide water to the community
KapkuresKapkures damDesilting, storage tank, equipping and distributionTo increase access to potable water and sanitation servicesJuly 2024June 202515,000,00 00-Design stageThe project had not started and was at design stage
KapkuresMumetet damKapkuresSolar pumping, storage tank and distributionTo increase access to potable water and sanitation servicesJuly 2024June 20250-Design stageNo works done; The project aimed to desilt the dam to increase its storage capacity and improve water quality
KapkuresKapkures ward water projectsKapkuresDrilling of bore holes, spring protection, constructio n of water tankTo increase access to potable water and sanitation servicesJuly 2024June 202511,000,00 000Design stageThe drilling of boreholes had not commenced; No protective measures for the springs had been implemented; The construction of the water tank had not started;
KapkuresMumetet water distributio n projectKapkures (soy)1.5km water distribution lineTo increase access to potable water and sanitation servicesJuly 2024Dec 20241,800,0001,800,00 0100Procurem entThe construction of the 1.5 KM water distribution line had not yet started
KapkuresMwamba spring water projectKapkures (soy)200meter perimeter fencing and spring protectionTo increase access to potable water and sanitation servicesJuly 2024Dec 20243,000,0003,000,00 0100Procurem entThe installation of the 200-meter perimeter fencing had not yet commenced; No protective measures for the springs had been implemented yet
KapkuresHire of equipment for constructi on of Kapkures cooler- Kapkoren -Chebarus roadsKapkuresGrading and gravellingTo improve road and transport infrastructur e4,000,000. 004,000,00 0.00CompleteThe grading and gravelling of a 1.5 km road segment connecting Kapkures to Kapkoren had been successfully completed; this development had improved the road's accessibility and durability, facilitating easier transportation and access for local residents; Two lines of culverts, each 600mm in diameter, had been installed along the 1.5 KM road segment; These culverts will improve drainage and reduce the risk of flooding, thereby enhancing the road's longevity and functionality
KapkuresDrainage improvem ent of Kabianga - Matunda Mission roadKapkuresDrainage improveme ntTo improve road and transport infrastructur e3,404,636. 003,401,87 4.00OngoingInstallation of culverts and construction of scourges, was ongoing.
KapkuresProposed installation of floodlights at Matunda trading centreKapkuresInstallation of streetlightsTo improve safety and condition of government buildingsJune 2024Sept 20243,000,000. 003,000,00 0.00Yet to startThe installation of floodlights at Matunda trading centre had not yet commenced; Planning and site assessments had been completed, and potential locations for the floodlights had been identified.
KapkuresPurchase & installation of streetlight spares for Kapkures wardKapkuresInstallation of streetlightsTo improve safety and condition of government buildingsJune 2024Sept 2024500,000.0 0500,000. 00CompleteThe streetlight spares for Kapkures ward had been successfully delivered and installed; This marked a significant improvement in the lighting infrastructure within the ward, enhancing safety and visibility for residents.
KapkuresProposed constructi on of Kapsumbe iywetKampi Chonjo box culvert (flagship)KapkuresDrainage improveme ntTo improve road and transport infrastructur e5,000,000. 00-Design stageThe project was at the design stage. Engineers and designers were still working on the technical plans and specifications for the box culvert.
KapkuresDrainage of assorted roads at Chukura, sigaon, Kapkures Mulimani & MatundaDrainage improveme ntTo improve road and transport infrastructur e13,575,11 3.00-Design stageThe drainage improvement project for the assorted roads was at the design stage. Engineers and designers are working on the technical plans and specifications for the drainage systems
KapkuresConstructi on of boda boda shade at ChukuraConstructio n of boda boda shadesTo improve road and transport infrastructur e400,000.0 0-Design stageThe project for constructing a boda boda shade at Chukura was at the design stage;