{"id":6990,"date":"2024-02-29T10:25:53","date_gmt":"2024-02-29T07:25:53","guid":{"rendered":"https:\/\/uasingishu.go.ke\/?p=6990"},"modified":"2024-02-29T11:11:24","modified_gmt":"2024-02-29T08:11:24","slug":"more-bridges-and-box-culverts-as-governor-dr-bii-expands-rural-road-network","status":"publish","type":"post","link":"https:\/\/uasingishu.go.ke\/index.php\/more-bridges-and-box-culverts-as-governor-dr-bii-expands-rural-road-network","title":{"rendered":"MORE BRIDGES AND BOX CULVERTS AS GOVERNOR DR.BII EXPANDS RURAL ROAD NETWORK"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<p>RCEA Lamaiywet Box Culvert in Kapsaos Ward,Turbo Sub County is the latest road project to be completed and among the major projects undertaken by Governor Dr.Jonathan Bii&#8217;s administration for long-term benefits in terms of safety, economic efficiency, infrastructure longevity among others.<\/p>\n\n\n\n<p>According to the residents who are also the beneficiaries, the box culvert will help ease their movement, besides boosting agriculture and other economic activities.<\/p>\n\n\n\n<p>Other major bridges are :Chebarus -Kosachei in Tapsagoi ward(ongoing) and Koisagat-Kapsabul in Segero Barsombe ward(Completed).The completed Box Culverts include: Kipkaren Estate Box Culvert in Kipkenyo Ward, Ketiplong-Bindura Box Culvert in Tulwet Chuiyat Ward, Ngara Falls -Chepyakwai Box Culvert in Ngeria Ward, Cheplaskei Box Culvert in Tapsagoi Ward,Joiland -Africana Box Culvert and Kapsaos Box Culvert in Kapsaos Ward, among others.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" data-id=\"6991\" src=\"https:\/\/uasingishu.go.ke\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-28-at-17.17.22-1024x1024.jpeg\" alt=\"\" class=\"wp-image-6991\" srcset=\"https:\/\/uasingishu.go.ke\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-28-at-17.17.22-1024x1024.jpeg 1024w, https:\/\/uasingishu.go.ke\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-28-at-17.17.22-300x300.jpeg 300w, https:\/\/uasingishu.go.ke\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-28-at-17.17.22-150x150.jpeg 150w, https:\/\/uasingishu.go.ke\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-28-at-17.17.22-768x768.jpeg 768w, https:\/\/uasingishu.go.ke\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-28-at-17.17.22-1536x1536.jpeg 1536w, https:\/\/uasingishu.go.ke\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-28-at-17.17.22-91x91.jpeg 91w, https:\/\/uasingishu.go.ke\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-28-at-17.17.22-250x250.jpeg 250w, https:\/\/uasingishu.go.ke\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-28-at-17.17.22-190x190.jpeg 190w, https:\/\/uasingishu.go.ke\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-28-at-17.17.22-69x69.jpeg 69w, https:\/\/uasingishu.go.ke\/wp-content\/uploads\/2024\/02\/WhatsApp-Image-2024-02-28-at-17.17.22.jpeg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>County Executive for Roads Eng Joseph Lagat has congratulated his team and contractors for delivering quality projects within timelines:<strong><em>&#8220;As a County ,we are committed to ensuring farmers across the county get quick markets for their products and that we increase road linkages to enhance accessibility.I thank the engineers,inspectors, surveyors and contractors for working closely for quality projects,&#8221;he said.<\/em><\/strong><\/p>\n<\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>RCEA Lamaiywet Box Culvert in Kapsaos Ward,Turbo Sub County is the latest road project to be completed and among the major projects undertaken by Governor Dr.Jonathan Bii&#8217;s administration for long-term [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":6991,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,227,247,226,142,7,50,126,231],"tags":[],"class_list":["post-6990","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-city-news","category-conducive-business-environment","category-county-secretary","category-department-of-lands-physical-planning-housing-and-urban-development","category-department-of-roads-transport-and-public-works","category-government","category-governors-office","category-water-irrigation-and-sanitation","category-wetlands-day"],"_links":{"self":[{"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/posts\/6990","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/comments?post=6990"}],"version-history":[{"count":1,"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/posts\/6990\/revisions"}],"predecessor-version":[{"id":6992,"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/posts\/6990\/revisions\/6992"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/media\/6991"}],"wp:attachment":[{"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/media?parent=6990"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/categories?post=6990"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/tags?post=6990"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}