{"id":13815,"date":"2025-09-08T11:29:50","date_gmt":"2025-09-08T08:29:50","guid":{"rendered":"https:\/\/uasingishu.go.ke\/?page_id=13815"},"modified":"2025-09-08T11:59:03","modified_gmt":"2025-09-08T08:59:03","slug":"turbo","status":"publish","type":"page","link":"https:\/\/uasingishu.go.ke\/index.php\/projects\/turbo","title":{"rendered":"Turbo"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"13815\" class=\"elementor elementor-13815\">\n\t\t\t\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-30eaec9 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"30eaec9\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2fecd75\" data-id=\"2fecd75\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t\t\t<div class=\"elementor-element elementor-element-4bc4ca8 elementor-widget elementor-widget-shortcode\" data-id=\"4bc4ca8\" data-element_type=\"widget\" data-widget_type=\"shortcode.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"elementor-shortcode\"><div id=\"footable_parent_13801\"\n         class=\" footable_parent ninja_table_wrapper loading_ninja_table wp_table_data_press_parent semantic_ui colored_table\">\n                <table data-ninja_table_instance=\"ninja_table_instance_0\" data-footable_id=\"13801\" data-filter-delay=\"1000\" aria-label=\"County Ward Projects - TURBO.csv\"            id=\"footable_13801\"\n           data-unique_identifier=\"ninja_table_unique_id_1306627365_13801\"\n           class=\" foo-table ninja_footable foo_table_13801 ninja_table_unique_id_1306627365_13801 ui table  ninja_search_right nt_type_legacy_table selectable striped compact ninja_custom_color inverted footable-paging-right ninja_table_pro ninja_table_afd_inline ninja_table_has_custom_filter\">\n                <colgroup>\n                            <col class=\"ninja_column_0 \">\n                            <col class=\"ninja_column_1 \">\n                            <col class=\"ninja_column_2 \">\n                            <col class=\"ninja_column_3 \">\n                            <col class=\"ninja_column_4 \">\n                            <col class=\"ninja_column_5 \">\n                            <col class=\"ninja_column_6 \">\n                            <col class=\"ninja_column_7 \">\n                            <col class=\"ninja_column_8 \">\n                            <col class=\"ninja_column_9 \">\n                    <\/colgroup>\n        <thead>\n<tr class=\"footable-header\">\n                                                                                                                                                                        <th scope=\"col\"  class=\"ninja_column_0 ninja_clmn_nm_sno \">Ward<\/th><th scope=\"col\"  class=\"ninja_column_1 ninja_clmn_nm_projectname \">Project \n Name<\/th><th scope=\"col\"  class=\"ninja_column_2 ninja_clmn_nm_activities \">Activities<\/th><th scope=\"col\"  class=\"ninja_column_3 ninja_clmn_nm_objectives \">Objectives<\/th><th scope=\"col\"  class=\"ninja_column_4 ninja_clmn_nm_startdate \">Start \n Date<\/th><th scope=\"col\"  class=\"ninja_column_5 ninja_clmn_nm_enddate \">End \n Date<\/th><th scope=\"col\"  class=\"ninja_column_6 ninja_clmn_nm_estimatedcostksh \">Estimated \n Cost \n (KSh)<\/th><th scope=\"col\"  class=\"ninja_column_7 ninja_clmn_nm_actualexpenditure \">Actual Expen diture<\/th><th scope=\"col\"  class=\"ninja_column_8 ninja_clmn_nm_implementationstatus \">Implementa tion Status<\/th><th scope=\"col\"  class=\"ninja_column_9 ninja_clmn_nm_remarks \">Remarks<\/th><\/tr>\n<\/thead>\n<tbody>\n\n        <tr data-row_id=\"406\" class=\"ninja_table_row_0 nt_row_id_406\">\n            <td>Kamagut<\/td><td>Koilel ECDE<\/td><td>Completion of a model ECDE classrooms<\/td><td>To improve access to quality \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>800,000<\/td><td>0<\/td><td>Ongoing<\/td><td>The project was funded KSh 800,000 in FY 2023\/24 and 2024\/25 respectively with main structure constructed, roofed and window panes installed; \n Remaining works included: plastering, ceiling board, painting, flooring, electrical works among other finishing works; \n The ECDE was a feeder school to Ainapngetich Pri. School with a population of 66 pupils and a transition rate of 100 percent attributable to school feeding program; Challenges included: inadequate budgetary allocation, inadequate teaching and learning materials and lack of ECDE toilets; \n Way forward: Need for additional budgetary allocation for completion of the project and construction of 4 door ablution block<\/td>        <\/tr>\n            <tr data-row_id=\"407\" class=\"ninja_table_row_1 nt_row_id_407\">\n            <td>Kamagut<\/td><td>Sambut \n ECDE<\/td><td>Completion of a model ECDE classrooms<\/td><td>To improve access to quality \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>600,000<\/td><td>0<\/td><td>Ongoing<\/td><td>The project was funded KSh 1M and KSh 600,000 in FY 2023\/24 and 2024\/25 respectively with main structure (2 classroom and 1 Adm. Block) constructed, roofed, floored and window panes installed; \n The ECDE centre had a population of 45 pupils with 100 percent transition rate attributable to school feeding program; \n Remaining works included: plastering, ceiling board, painting among other finishing works;<\/td>        <\/tr>\n            <tr data-row_id=\"408\" class=\"ninja_table_row_2 nt_row_id_408\">\n            <td>Kamagut<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"409\" class=\"ninja_table_row_3 nt_row_id_409\">\n            <td>Kamagut<\/td><td>Kapkatet \n ECDE<\/td><td>Completion of a model ECDE classroom<\/td><td>To improve access to quality \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>300,000<\/td><td>0<\/td><td>Ongoing<\/td><td>The project was allocated KSh 1M and KSh 300,000 in the FY 2023\/24 and 2024\/25 respectively with the main structure (2 classrooms and 1 Adm. Block) constructed, roofed, metallic doors installed and window frames mounted; \n The ECDE was a feeder school to Sambut Pri. School, had a population of 34 pupils and recorded a 100 percent transition rate occasioned by the school feeding program; Remaining works included: flooring, plastering, ceiling board, installation of window panes among other works; Challenges noted were: inadequate funding hence slowed construction works, inadequate teaching and learning materials and lack of ECDE toilets; \n Way forward: Need for adequate budgetary allocation to support completion of the project and construction of 4 door ablution block<\/td>        <\/tr>\n            <tr data-row_id=\"410\" class=\"ninja_table_row_4 nt_row_id_410\">\n            <td>Kamagut<\/td><td>Seiyot Water \n Project<\/td><td>Piping, raising of steel tower and solarization<\/td><td>To increase access to potable water<\/td><td>June \n 2023<\/td><td>July \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>Project was funded in the FY2023\/24; \n Distribution lines done stretching up to 2KM with an average of 93HH, AIC Seiyot Pri. &amp; Secondary School connected, 16 solars (195 watts) installed, power house constructed, steel tank (24,000 ltrs) raised and fencing done;<\/td>        <\/tr>\n            <tr data-row_id=\"411\" class=\"ninja_table_row_5 nt_row_id_411\">\n            <td>Kamagut<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"412\" class=\"ninja_table_row_6 nt_row_id_412\">\n            <td>Kamagut<\/td><td>Kamagut Fish \n Pond<\/td><td>Construction of 10*20M fish pond, supply of 2\u201d male fingerlings &amp; feeds<\/td><td>To promote sustainable food production<\/td><td>July \n 2024<\/td><td>Dec. \n 2024<\/td><td>2,000,000<\/td><td>-<\/td><td>Ongoing<\/td><td>The project was funded by FLLoca and its set to benefit \n Sosiani farmers\u2019 cooperative up on completion<\/td>        <\/tr>\n            <tr data-row_id=\"413\" class=\"ninja_table_row_7 nt_row_id_413\">\n            <td>Kamagut<\/td><td>Sambut \n Trading \n Centre<\/td><td>Installation of street lights<\/td><td>To enhance access to clean and affordable energy<\/td><td>June \n 2024<\/td><td>July \n 2024<\/td><td>2,500,000<\/td><td>2,500,0\n 00<\/td><td>Completed<\/td><td>Streetlights installed in various points across the centre and others replaced at Jua Kali centre<\/td>        <\/tr>\n            <tr data-row_id=\"414\" class=\"ninja_table_row_8 nt_row_id_414\">\n            <td>Kamagut<\/td><td>Incubators<\/td><td>Procurement &amp; distribution of \n Hybridization ovens<\/td><td>To increase livestock production<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>2,000,000<\/td><td>1,999,9\n 83<\/td><td>Completed<\/td><td>16 incubators delivered awaiting distribution to all registered groups across the ward<\/td>        <\/tr>\n            <tr data-row_id=\"415\" class=\"ninja_table_row_9 nt_row_id_415\">\n            <td>Kamagut<\/td><td>Sosiani \n Health Centre<\/td><td>Renovation of \n the facility<\/td><td>To increase access to quality medicare<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>3,200,000<\/td><td>-<\/td><td>Stalled<\/td><td>Project was full contract, with contractor not on site; Works done included painting, tilling, fixing of doors and installing of grills; \n Remaining works included: replacement of iron sheets, tiling section of the corridors among other finishing works; Challenges noted: inadequate budget provision leading to slowed progress;<\/td>        <\/tr>\n            <tr data-row_id=\"416\" class=\"ninja_table_row_10 nt_row_id_416\">\n            <td>Kamagut<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"417\" class=\"ninja_table_row_11 nt_row_id_417\">\n            <td>Kamagut<\/td><td>Sosiani \n Health Centre<\/td><td>Provision of imaging space, lead shielding, powering &amp; moving machine in \n situ<\/td><td>To increase access to quality medicare<\/td><td>Marc\n h \n 2024<\/td><td>June \n 2024<\/td><td>1,000,000<\/td><td>1,000,0\n 00<\/td><td>Completed<\/td><td>Renovation of the room completed and Xray machine installed; \n However, the Xray was not operational for 2 years due to lack of imaging software; \n Patience referred to Turbo SCH for imaging; Challenges included: Lack of male wards and the existing bed capacity of 4 beds for women was inadequate, lack of imaging software making the Xray machine none functional \n Way forward: Need to acquire imagine software, construct male wards and expand the existing female wards<\/td>        <\/tr>\n            <tr data-row_id=\"418\" class=\"ninja_table_row_12 nt_row_id_418\">\n            <td>Kamagut<\/td><td>Sambut \n Water Supply \n Project<\/td><td>Rehabilitation of treatment works, pump house, staff houses construction of water tank, rising main &amp; distribution works<\/td><td>To increase access to potable water<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>39,232,250<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"419\" class=\"ninja_table_row_13 nt_row_id_419\">\n            <td>Kamagut<\/td><td>Sambut \n Water Supply \n Project<\/td><td>Land banking<\/td><td>To increase access to potable water<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>2,500,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at negotiation stage<\/td>        <\/tr>\n            <tr data-row_id=\"420\" class=\"ninja_table_row_14 nt_row_id_420\">\n            <td>Kamagut<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"421\" class=\"ninja_table_row_15 nt_row_id_421\">\n            <td>Kamagut<\/td><td>Supply of borehole \n drilling materials<\/td><td>Supply of borehole \n drilling materials<\/td><td>To increase access to potable water<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>20,855,398<\/td><td>0<\/td><td>Completed<\/td><td>Projects was initiated in the FY 2023\/24 currently awaiting payment<\/td>        <\/tr>\n            <tr data-row_id=\"422\" class=\"ninja_table_row_16 nt_row_id_422\">\n            <td>Kamagut<\/td><td>Sosiani dam\/water supply<\/td><td>Desilting, construction of treatment works &amp; equipping<\/td><td>To increase access to potable water<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>-<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"423\" class=\"ninja_table_row_17 nt_row_id_423\">\n            <td>Kamagut<\/td><td>Kapwilly Dam<\/td><td>Distribution works<\/td><td>To increase access to potable water<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>6,900,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"424\" class=\"ninja_table_row_18 nt_row_id_424\">\n            <td>Kamagut<\/td><td>Supply, installation and commissionin g of 60 units of street lighting<\/td><td>Supply, installation and commissioning of 60 units of street lighting networks and 6 high masts<\/td><td>To increase access to electricity<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>48,000,000<\/td><td>48,000,\n 000<\/td><td>Ongoing<\/td><td>Project was on progress with some wards completed, pending metering<\/td>        <\/tr>\n            <tr data-row_id=\"425\" class=\"ninja_table_row_19 nt_row_id_425\">\n            <td>Kamagut<\/td><td>Cheptabach \n North<\/td><td>Completion of \n Classroom<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>600,000<\/td><td>600,00\n 0<\/td><td>Pre procurement<\/td><td>Requisition on process<\/td>        <\/tr>\n            <tr data-row_id=\"426\" class=\"ninja_table_row_20 nt_row_id_426\">\n            <td>Kamagut<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"427\" class=\"ninja_table_row_21 nt_row_id_427\">\n            <td>Kamagut<\/td><td>Chepkongi \n ECDE<\/td><td>Completion of classroom<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>900,000<\/td><td>900,00\n 0<\/td><td>Pre procurement<\/td><td>Requisition on process<\/td>        <\/tr>\n            <tr data-row_id=\"428\" class=\"ninja_table_row_22 nt_row_id_428\">\n            <td>Kamagut<\/td><td>St. Stephen \n ECDE<\/td><td>Completion of classroom<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>500,000<\/td><td>500,00\n 0<\/td><td>Pre procurement<\/td><td>Requisition on process<\/td>        <\/tr>\n            <tr data-row_id=\"429\" class=\"ninja_table_row_23 nt_row_id_429\">\n            <td>Kamagut<\/td><td>Leseru Tangit \n ECDE<\/td><td>Completion of \n Classroom<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>500,000<\/td><td>500,00\n 0<\/td><td>Pre procurement<\/td><td>Requisition on process<\/td>        <\/tr>\n            <tr data-row_id=\"430\" class=\"ninja_table_row_24 nt_row_id_430\">\n            <td>Kamagut<\/td><td>Talent \n Development<\/td><td>Purchase of sports kits<\/td><td>To promote sports \n developme\n nt<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>10,150,000<\/td><td>9,650,0\n 00<\/td><td>Completed<\/td><td>Project was funded in the FY 2023\/24; \n Assorted sports kits purchased benefitting 25 groups<\/td>        <\/tr>\n            <tr data-row_id=\"431\" class=\"ninja_table_row_25 nt_row_id_431\">\n            <td>Kamagut<\/td><td><\/td><td>Purchase of sports kits<\/td><td>To promote sports \n developme\n nt<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>11,100,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project awaiting PIC report before it rolled out<\/td>        <\/tr>\n            <tr data-row_id=\"432\" class=\"ninja_table_row_26 nt_row_id_432\">\n            <td>Kamagut<\/td><td>Youth \n Empowermen\n t<\/td><td>Procuring and distribution of tools and equipment<\/td><td>To increase access to youth \n empowerm\n ent<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>15,800,000<\/td><td>14,285,\n 600<\/td><td>Completed<\/td><td>Tools and equipment purchased benefitting youths across the ward<\/td>        <\/tr>\n            <tr data-row_id=\"433\" class=\"ninja_table_row_27 nt_row_id_433\">\n            <td>Kamagut<\/td><td><\/td><td><\/td><td><\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>12,800,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Awaiting PIC report<\/td>        <\/tr>\n            <tr data-row_id=\"434\" class=\"ninja_table_row_28 nt_row_id_434\">\n            <td>Kamagut<\/td><td>Youth \n Empowermen\n t<\/td><td>Provision of driving lessons to the Youth<\/td><td>To increase access to<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>27,135,610<\/td><td>0<\/td><td>Completed<\/td><td>The FY 23\/24 training program was done, awaiting issuing of driving licences<\/td>        <\/tr>\n            <tr data-row_id=\"435\" class=\"ninja_table_row_29 nt_row_id_435\">\n            <td>Kamagut<\/td><td><\/td><td><\/td><td>youth \n empowerm\n ent<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"436\" class=\"ninja_table_row_30 nt_row_id_436\">\n            <td>Kamagut<\/td><td><\/td><td><\/td><td><\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>37,200,000<\/td><td>0<\/td><td>Ongoing<\/td><td>Preparation of Terms of Reference ongoing<\/td>        <\/tr>\n            <tr data-row_id=\"437\" class=\"ninja_table_row_31 nt_row_id_437\">\n            <td>Kamagut<\/td><td>Purchase of seedlings<\/td><td>Purchase and issuing<\/td><td>To increase crop productivity<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>12,000,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Requisitions to be done<\/td>        <\/tr>\n            <tr data-row_id=\"438\" class=\"ninja_table_row_32 nt_row_id_438\">\n            <td>Kamagut<\/td><td>Coffee pulping station<\/td><td>Construction and \n installation<\/td><td>To promote value addition<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>40,000,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Feasibility study ongoing<\/td>        <\/tr>\n            <tr data-row_id=\"439\" class=\"ninja_table_row_33 nt_row_id_439\">\n            <td>Kamagut<\/td><td>Construction\/ Renovation of cattle dips<\/td><td>Rehabilitation of cattle dips<\/td><td>To increase livestock production<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>10,775,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Transfer of fund<\/td>        <\/tr>\n            <tr data-row_id=\"440\" class=\"ninja_table_row_34 nt_row_id_440\">\n            <td>Kamagut<\/td><td>Purchase of incubators<\/td><td>Procurement and \n distribution of Hybridization ovens<\/td><td>To increase livestock production<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>2,000,000<\/td><td>1,999,9\n 83<\/td><td>Completed<\/td><td>Project done, awaiting payment<\/td>        <\/tr>\n            <tr data-row_id=\"441\" class=\"ninja_table_row_35 nt_row_id_441\">\n            <td>Kamagut<\/td><td>Proposed \n installation of Solar streetlights<\/td><td>Installation of streetlights<\/td><td>To enhance access to clean and affordable energy<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>3,000,000.\n 00<\/td><td>-<\/td><td>Yet to start<\/td><td>Project awarded, to be implemented at Ainabngetik \n Trading Centre<\/td>        <\/tr>\n            <tr data-row_id=\"442\" class=\"ninja_table_row_36 nt_row_id_442\">\n            <td>Kamagut<\/td><td>Grading and Gravelling of roads<\/td><td>Grading, \n Gravelling &amp; \n Murrumming<\/td><td>Improve road and transport connectivit y<\/td><td><\/td><td><\/td><td>16,575,113<\/td><td><\/td><td>Pre procurement<\/td><td>Various sections of roads across the ward were at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"443\" class=\"ninja_table_row_37 nt_row_id_443\">\n            <td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"444\" class=\"ninja_table_row_38 nt_row_id_444\">\n            <td>Ngenyilel <\/td><td>Ngenyilel \n VTC<\/td><td>Construction of administration block<\/td><td>To enhance effective and efficient working environment<\/td><td>Nov. \n 2022<\/td><td>April \n 2023<\/td><td>96,000,000<\/td><td>33,000,000<\/td><td>Ongoing<\/td><td>Project was full contract with contractor on site; \n Construction of main structure done; \n Roofing completed; \n Remaining works included: flooring, glassing, plastering, ceiling among other finishing works; \n Challenges: Inadequate budgetary allocation leading to slowed finishing works Way forward: Need for prompt funding of the project<\/td>        <\/tr>\n            <tr data-row_id=\"445\" class=\"ninja_table_row_39 nt_row_id_445\">\n            <td>Ngenyilel <\/td><td>Ngenyilel \n VTC<\/td><td>Purchase of teaching &amp; learning materials<\/td><td>To enhance teaching and learning<\/td><td>Sept \n 2024<\/td><td>June \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>The VTC had an average of 350 students and a total of 11 instructors; \n Assorted teaching and learning materials were issued; \n Challenges: Inadequate learning materials and instructors; \n Way forward: Need for additional budgetary allocation for acquisition of teaching aids and deployment of additional instructors<\/td>        <\/tr>\n            <tr data-row_id=\"446\" class=\"ninja_table_row_40 nt_row_id_446\">\n            <td>Ngenyilel <\/td><td>Labuiywet \n Water \n Project<\/td><td>Equipping and distribution<\/td><td>To increase access to portable water and sanitation services<\/td><td>Dec \n 2024<\/td><td>Jan \n 2025<\/td><td>5,000,000<\/td><td>-<\/td><td>Ongoing<\/td><td>Contractor on site with elevation of 24,000 ltrs steel tank ongoing; \n Up on completion, the project shall serve \n Labuiywet Pri. School and an average of \n 500HH \n Way forward: Need for additional distribution lines to reach more residence<\/td>        <\/tr>\n            <tr data-row_id=\"447\" class=\"ninja_table_row_41 nt_row_id_447\">\n            <td>Ngenyilel <\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"448\" class=\"ninja_table_row_42 nt_row_id_448\">\n            <td>Ngenyilel <\/td><td>Kimolwet 1 water project<\/td><td>Equipping and distribution<\/td><td>To increase access to portable water and sanitation services<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>5,600,000<\/td><td>-<\/td><td>Completed<\/td><td>Borehole drilled and fencing done; 8 solar panels installed and pump house constructed; \n Laying of pipes done and elevation of \n 24,000 ltrs steel tank completed; \n Construction of 4 water points done; The project serves Kimolwet primary school and an average of 50HH; Challenges: Leakage on the steel tank and in the gate valve, inadequate storage tanks; \n Way forward: Need for the repair of leakages, budgetary allocation for the additional steel tank and measures be instituted for project\u2019s sustainability<\/td>        <\/tr>\n            <tr data-row_id=\"449\" class=\"ninja_table_row_43 nt_row_id_449\">\n            <td>Ngenyilel <\/td><td>Mogoon \n Water \n Project<\/td><td>Equipping and \n Distribution<\/td><td>To increase access to portable water and sanitation services<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>5469757<\/td><td>-<\/td><td>Completed<\/td><td>Distribution works yet to commence; Pump house constructed and 18 solar panels installed; \n 24,000 ltrs steel tank elevated and fencing completed; \n 3 water points constructed; \n The project serves Moogon Primary with a school population of 300 pupils and Kapchesungno and Moogon centre respectively; \n Challenges: Inadequate distribution lines Way forward: Need for extension of distribution lines with 300HH expected to benefit ones completed<\/td>        <\/tr>\n            <tr data-row_id=\"450\" class=\"ninja_table_row_44 nt_row_id_450\">\n            <td>Ngenyilel <\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"451\" class=\"ninja_table_row_45 nt_row_id_451\">\n            <td>Ngenyilel <\/td><td>Murgusi \n Dispensary \n Water \n Project<\/td><td>Equipping and distribution<\/td><td>To increase access to portable water and sanitation services<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>Additional distribution yet to commence; Some activities were done in the previous financial years such as laying of pipes, construction of pump house, installation of 9 solar panels, elevation of 24,000 ltrs steel tank and construction of 3 community water points; \n Project serves Murgusi dispensary and an average of 130HH \n Challenges: Inadequate distribution lines Way forward: Need for additional lines to reach more residence<\/td>        <\/tr>\n            <tr data-row_id=\"452\" class=\"ninja_table_row_46 nt_row_id_452\">\n            <td>Ngenyilel <\/td><td>Supply of borehole \n drilling materials<\/td><td>Supply of borehole \n drilling materials<\/td><td>To increase access to potable water and sanitation services<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>20,855,398<\/td><td>-<\/td><td>Completed<\/td><td>Project was funded in the FY 2023\/24 with assorted drilling materials supplied<\/td>        <\/tr>\n            <tr data-row_id=\"453\" class=\"ninja_table_row_47 nt_row_id_453\">\n            <td>Ngenyilel <\/td><td>Kapsapen Kipkaren river dam<\/td><td>Desilting and distribution<\/td><td>To increase access to potable water and sanitation services<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>15,000,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"454\" class=\"ninja_table_row_48 nt_row_id_454\">\n            <td>Ngenyilel <\/td><td>Mwangaza, \n Chepkemel, \n Magut, \n Tebeson, \n Chebaiywa<\/td><td>Borehole \n drilling &amp; equipping<\/td><td>To increase access to potable water and sanitation services<\/td><td>July \n 2024<\/td><td>June \n 225<\/td><td>6,400,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"455\" class=\"ninja_table_row_49 nt_row_id_455\">\n            <td>Ngenyilel <\/td><td>Kapkoi dam<\/td><td>Desilting and equipping<\/td><td>To increase access to potable water and sanitation services<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>-<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"456\" class=\"ninja_table_row_50 nt_row_id_456\">\n            <td>Ngenyilel <\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"457\" class=\"ninja_table_row_51 nt_row_id_457\">\n            <td>Ngenyilel <\/td><td>Kimolwet water project<\/td><td>Distribution<\/td><td>To increase access to potable water and sanitation services<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>200,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"458\" class=\"ninja_table_row_52 nt_row_id_458\">\n            <td>Ngenyilel <\/td><td>Mwangaza \n Water \n Project<\/td><td>Drilling and equipping with solar panels<\/td><td>To increase access to potable water and sanitation services<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>5,700,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"459\" class=\"ninja_table_row_53 nt_row_id_459\">\n            <td>Ngenyilel <\/td><td>Chepkemel Water \n project<\/td><td>Drilling and equipping with solar panels<\/td><td>To increase access to potable water and sanitation services<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>5,700,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"460\" class=\"ninja_table_row_54 nt_row_id_460\">\n            <td>Ngenyilel <\/td><td>Magut Water \n project<\/td><td>Drilling and equipping with solar panels<\/td><td>To increase access to potable water and sanitation services<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>5,700,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"461\" class=\"ninja_table_row_55 nt_row_id_461\">\n            <td>Ngenyilel <\/td><td>Tebeson Water \n project<\/td><td>Drilling and equipping with solar panels<\/td><td>To increase access to potable water and sanitation services<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>5,700,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"462\" class=\"ninja_table_row_56 nt_row_id_462\">\n            <td>Ngenyilel <\/td><td>Chebaiywa \n Water \n Project<\/td><td>Drilling and equipping with solar panels<\/td><td>To increase access to potable water and sanitation services<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>5,700,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"463\" class=\"ninja_table_row_57 nt_row_id_463\">\n            <td>Ngenyilel <\/td><td>Koitabut water project<\/td><td>Planting of 100 tree seedlings, rehabilitation<\/td><td>To increase access to potable water<\/td><td>July \n 2024<\/td><td>Dec \n 2024<\/td><td>2,500,000<\/td><td>0<\/td><td>Procurement stage<\/td><td>Project was at initial stages of procurement<\/td>        <\/tr>\n            <tr data-row_id=\"464\" class=\"ninja_table_row_58 nt_row_id_464\">\n            <td>Ngenyilel <\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"465\" class=\"ninja_table_row_59 nt_row_id_465\">\n            <td>Ngenyilel <\/td><td><\/td><td>works &amp; laying distribution<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"466\" class=\"ninja_table_row_60 nt_row_id_466\">\n            <td>Ngenyilel <\/td><td>Ng\u2019enyilel fish pond<\/td><td>Construction of a 10*20m fish pond, supply of 2\u201d male fingerlings and \n feeds<\/td><td>To enhance sustainable food production<\/td><td>July \n 2024<\/td><td>Dec \n 2024<\/td><td>2,000,000<\/td><td>0<\/td><td>Procurement stage<\/td><td>Project was at initial stages of procurement<\/td>        <\/tr>\n            <tr data-row_id=\"467\" class=\"ninja_table_row_61 nt_row_id_467\">\n            <td>Ngenyilel <\/td><td>Street lighting<\/td><td>Supply, installation and commissioning of 60 units of street lighting networks and 6 high masts<\/td><td>To increase access \n to electricity<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>48,000,000<\/td><td>-<\/td><td>Ongoing<\/td><td>Project was ongoing with some wards completed pending metering<\/td>        <\/tr>\n            <tr data-row_id=\"468\" class=\"ninja_table_row_62 nt_row_id_468\">\n            <td>Ngenyilel <\/td><td>Murgusi \n ECDE<\/td><td>Construction of \n Kitchen<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>300,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at requisitioning stage<\/td>        <\/tr>\n            <tr data-row_id=\"469\" class=\"ninja_table_row_63 nt_row_id_469\">\n            <td>Ngenyilel <\/td><td>Murgusi \n ECDE<\/td><td>Construction of \n Ablution Block<\/td><td>Improve sanitation in ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>300,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at requisitioning stage<\/td>        <\/tr>\n            <tr data-row_id=\"470\" class=\"ninja_table_row_64 nt_row_id_470\">\n            <td>Ngenyilel <\/td><td>Chebaiywa \n ECDE<\/td><td>Construction of \n Kitchen<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>300,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at requisitioning stage<\/td>        <\/tr>\n            <tr data-row_id=\"471\" class=\"ninja_table_row_65 nt_row_id_471\">\n            <td>Ngenyilel <\/td><td>Chebaiywa \n ECDE<\/td><td>Construction of \n Ablution block<\/td><td>Improve Sanitation in ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>300,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at requisitioning stage<\/td>        <\/tr>\n            <tr data-row_id=\"472\" class=\"ninja_table_row_66 nt_row_id_472\">\n            <td>Ngenyilel <\/td><td>Mwembe \n ECDE<\/td><td>Construction of \n Kitchen<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>300,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at requisitioning stage<\/td>        <\/tr>\n            <tr data-row_id=\"473\" class=\"ninja_table_row_67 nt_row_id_473\">\n            <td>Ngenyilel <\/td><td>Mwembe \n ECDE<\/td><td>Construction of \n Ablution block<\/td><td>Improve access sanitation in ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>300,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at requisitioning stage<\/td>        <\/tr>\n            <tr data-row_id=\"474\" class=\"ninja_table_row_68 nt_row_id_474\">\n            <td>Ngenyilel <\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"475\" class=\"ninja_table_row_69 nt_row_id_475\">\n            <td>Ngenyilel <\/td><td>Kunguna \n ECDE<\/td><td>Construction of \n Classroom<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>900,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at requisitioning stage<\/td>        <\/tr>\n            <tr data-row_id=\"476\" class=\"ninja_table_row_70 nt_row_id_476\">\n            <td>Ngenyilel <\/td><td>St. Marys \n Mogoon \n ECDE<\/td><td>Completion of \n Classroom<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>300,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at requisitioning stage<\/td>        <\/tr>\n            <tr data-row_id=\"477\" class=\"ninja_table_row_71 nt_row_id_477\">\n            <td>Ngenyilel <\/td><td>Talent \n Developmen\n t<\/td><td>Purchase of sports kits<\/td><td>To promote sports development<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>Sports kits purchased and distributed to various teams across the ward<\/td>        <\/tr>\n            <tr data-row_id=\"478\" class=\"ninja_table_row_72 nt_row_id_478\">\n            <td>Ngenyilel <\/td><td><\/td><td>Purchase of sports kits<\/td><td>To promote sports development<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>0<\/td><td>0<\/td><td>Pre procurement<\/td><td>Awaiting PIC report<\/td>        <\/tr>\n            <tr data-row_id=\"479\" class=\"ninja_table_row_73 nt_row_id_479\">\n            <td>Ngenyilel <\/td><td>Youth \n Empowerme\n nt<\/td><td>Procuring and distribution of tools and equipment<\/td><td>To increase access to youth empowerment<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>Project was for the FY 2023\/24 with tools and equipment purchased and issues to youths across the ward<\/td>        <\/tr>\n            <tr data-row_id=\"480\" class=\"ninja_table_row_74 nt_row_id_480\">\n            <td>Ngenyilel <\/td><td><\/td><td><\/td><td><\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>0<\/td><td>0<\/td><td>Yet to start<\/td><td>Awaiting PIC report<\/td>        <\/tr>\n            <tr data-row_id=\"481\" class=\"ninja_table_row_75 nt_row_id_481\">\n            <td>Ngenyilel <\/td><td><\/td><td>Provision of driving lessons to the youth<\/td><td>To increase access to youth empowerment<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>The FY 23\/24 training program was completed, awaiting issuance of driving licenses<\/td>        <\/tr>\n            <tr data-row_id=\"482\" class=\"ninja_table_row_76 nt_row_id_482\">\n            <td>Ngenyilel <\/td><td><\/td><td><\/td><td><\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>0<\/td><td>0<\/td><td>Pre procurement<\/td><td>Preparation of Terms of Reference ongoing<\/td>        <\/tr>\n            <tr data-row_id=\"483\" class=\"ninja_table_row_77 nt_row_id_483\">\n            <td>Ngenyilel <\/td><td>Construction\n \/ \n Rehabilitatio n of Cattle dips<\/td><td>Construction of cattle dips; Training of dip committees<\/td><td>To increase livestock production<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>20,850,000<\/td><td>-<\/td><td>Pre procurement<\/td><td>Development of BQ in progress for the FY \n 2022\/23 and 2023\/24<\/td>        <\/tr>\n            <tr data-row_id=\"484\" class=\"ninja_table_row_78 nt_row_id_484\">\n            <td>Ngenyilel <\/td><td>Inua mama na kuku (Improved<\/td><td>Purchase and \n distribution of improved chicken breeds<\/td><td>To increase livestock production<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>8,200,000<\/td><td>-<\/td><td>Yet to start<\/td><td>Tender awarded for the implementation of the project<\/td>        <\/tr>\n            <tr data-row_id=\"485\" class=\"ninja_table_row_79 nt_row_id_485\">\n            <td>Ngenyilel <\/td><td>Kienyeji chicken)<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"486\" class=\"ninja_table_row_80 nt_row_id_486\">\n            <td>Ngenyilel <\/td><td>Drainage improvement of roads across the ward<\/td><td>Drainage \n Improvement<\/td><td>Improve road and transport connectivity<\/td><td>-<\/td><td>-<\/td><td>6,075,113.\n 00<\/td><td>-<\/td><td>Pre procurement<\/td><td>Project was at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"487\" class=\"ninja_table_row_81 nt_row_id_487\">\n            <td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"488\" class=\"ninja_table_row_82 nt_row_id_488\">\n            <td>Kapsaos<\/td><td>Office and Milk \n Store<\/td><td>Construction of office and milk store<\/td><td>To enhance cooperative movement<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>3,000,00\n 0<\/td><td>0<\/td><td>Ongoing<\/td><td>The purchase of 0.8 Ha. was done in the FY \n 2023\/24 with construction of office and a store set to commence in FY 2024\/25; \n The cooperative had a total of 120 memberships Challenges were: Slowed release of development funds to the project \n Way forward: Need for prompt release of projects funds<\/td>        <\/tr>\n            <tr data-row_id=\"489\" class=\"ninja_table_row_83 nt_row_id_489\">\n            <td>Kapsaos<\/td><td>Kaplamai \n Wetland Water \n Project<\/td><td>Solarization, raising of steel tank<\/td><td>To increase access to portable water<\/td><td>July \n 2024<\/td><td>Dec. \n 2024<\/td><td>5,000,00\n 0<\/td><td>0<\/td><td>Stalled<\/td><td>The project was full contract funded by FLLoca; \n Contractor not on site \n Challenges: project was delayed due to land related dispute \n Way forward: Need to resolve the standoff for the project to commence<\/td>        <\/tr>\n            <tr data-row_id=\"490\" class=\"ninja_table_row_84 nt_row_id_490\">\n            <td>Kapsaos<\/td><td>Kapyemit \n Water Project<\/td><td>Equipping &amp; distribution<\/td><td>To increase access to portable water<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>Project was done in the FY 2023\/24 with pipping, raising of 10,000 ltrs steel tank and installation of \n 16 solar panels completed; \n The projects serve an average of 500HH and \n Primary School; \n Challenges: lack of routine maintenance of the pipping system, lack of sustainability strategies; Way forward: Need for periodic pipping maintenance and measures put to sustain the project<\/td>        <\/tr>\n            <tr data-row_id=\"491\" class=\"ninja_table_row_85 nt_row_id_491\">\n            <td>Kapsaos<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"492\" class=\"ninja_table_row_86 nt_row_id_492\">\n            <td>Kapsaos<\/td><td>Emsos ECDE<\/td><td>Construction of a model ECDE centre<\/td><td>To improve access to \n ECDE<\/td><td>Sept. \n 2024<\/td><td>June \n 2025<\/td><td>1,000,00\n 0<\/td><td>-<\/td><td>Ongoing<\/td><td>Construction of main structure (2 classrooms &amp;1 \n Adm. Block) done and roofed; \n The project was a feeder school to Emkoin Pri. School with a population of 26 pupils and 100 percent transition rate attributable to the school feeding program; \n Remaining works included: ceiling, plastering, flooring, installation of window panes among other finishing works; \n Challenges included: inadequate teaching and learning materials, lack of ECDE toilet and a \n Kitchen; \n Way forward: Need for adequate budgetary allocation for the completion of the project, construction of 4 door ablution block and a kitchen<\/td>        <\/tr>\n            <tr data-row_id=\"493\" class=\"ninja_table_row_87 nt_row_id_493\">\n            <td>Kapsaos<\/td><td>Kapsaos \n Spring \n Protection<\/td><td>Spring protection, construction of a sump, \n solarization, tank and distribution<\/td><td>To increase access to portable water<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>-<\/td><td>-<\/td><td>Not started<\/td><td>Project was funded under FLLoca; \n Project yet to start; \n Up on completion, the project shall serve Kapsaos Primary and an average of 100HH (domestic &amp; small-scale irrigation) \n Challenges included: delayed release of projects funds, lengthy procurement process; \n Way forward: Need for prompt release of projects funds and speedy procurement<\/td>        <\/tr>\n            <tr data-row_id=\"494\" class=\"ninja_table_row_88 nt_row_id_494\">\n            <td>Kapsaos<\/td><td>Katanin ECDE<\/td><td>Construction of a model ECDE centre<\/td><td>To improve access to \n ECDE<\/td><td>Sept. \n 2024<\/td><td>June \n 2025<\/td><td>1,000,00\n 0<\/td><td>0<\/td><td>Ongoing<\/td><td>Land (0.2Ha) was acquired in the FY 2023\/24 with construction work set to begging in the FY \n 2024\/25; \n The nearest ECDE Centre was Kapyemit &amp; \n Kapsaos;<\/td>        <\/tr>\n            <tr data-row_id=\"495\" class=\"ninja_table_row_89 nt_row_id_495\">\n            <td>Kapsaos<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"496\" class=\"ninja_table_row_90 nt_row_id_496\">\n            <td>Kapsaos<\/td><td>Street Lighting<\/td><td>Purchase &amp; \n installation of streetlighting accessories<\/td><td>to enhance access to clean &amp; affordable energy<\/td><td>-<\/td><td>-<\/td><td>3,000,00\n 0<\/td><td>2,999,9\n 44<\/td><td>Completed<\/td><td>A stretch of 3.2KM was repaired and solar panels installed<\/td>        <\/tr>\n            <tr data-row_id=\"497\" class=\"ninja_table_row_91 nt_row_id_497\">\n            <td>Kapsaos<\/td><td>Kapkeben \n Water Project<\/td><td>Equipping and distribution<\/td><td>To increase access to portable water<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>-<\/td><td>-<\/td><td>Ongoing<\/td><td>Drilling, solarization (18 panels), 2 plastic tanks \n (10,000 ltrs), and 1 water point completed in the \n FY 2022\/23; \n Remaining work included: distribution works Challenges: delayed release of project funds and lack of sustainability strategies; \n Way forward: Need for adequate and prompt release of funds and measures to sustain the projects<\/td>        <\/tr>\n            <tr data-row_id=\"498\" class=\"ninja_table_row_92 nt_row_id_498\">\n            <td>Kapsaos<\/td><td>Supply of borehole \n drilling material<\/td><td>Supply of borehole drilling materials<\/td><td>To increase access to potable water<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>20,855,3\n 98<\/td><td>0<\/td><td>Completed<\/td><td>Project funded in the FY 2023\/24; \n Project completed, awaiting payment<\/td>        <\/tr>\n            <tr data-row_id=\"499\" class=\"ninja_table_row_93 nt_row_id_499\">\n            <td>Kapsaos<\/td><td>Kapkeben \n Springs<\/td><td>Spring \n Protection<\/td><td>To increase access to potable water<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>15,000,0\n 00<\/td><td>0<\/td><td>Pre procurement<\/td><td>Design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"500\" class=\"ninja_table_row_94 nt_row_id_500\">\n            <td>Kapsaos<\/td><td>Africana \n ECDE<\/td><td>Construction of \n Classroom<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>1,000,00\n 0<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"501\" class=\"ninja_table_row_95 nt_row_id_501\">\n            <td>Kapsaos<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"502\" class=\"ninja_table_row_96 nt_row_id_502\">\n            <td>Kapsaos<\/td><td>Talent \n Development<\/td><td>Purchase of sports kits<\/td><td>To promote \n Sports \n Development<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>Sports kits purchased and distributed to various teams across the ward<\/td>        <\/tr>\n            <tr data-row_id=\"503\" class=\"ninja_table_row_97 nt_row_id_503\">\n            <td>Kapsaos<\/td><td><\/td><td><\/td><td><\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>11,100,0\n 00<\/td><td>0<\/td><td>Pre procurement<\/td><td>Awaiting PIC report<\/td>        <\/tr>\n            <tr data-row_id=\"504\" class=\"ninja_table_row_98 nt_row_id_504\">\n            <td>Kapsaos<\/td><td>Youth \n Empowerment<\/td><td>Procuring and distribution of tools and equipment<\/td><td>To increase access to youth empowerment<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>15,800,0\n 00<\/td><td>-<\/td><td>Completed<\/td><td>Tools and equipment purchased and distributed to youths across the ward<\/td>        <\/tr>\n            <tr data-row_id=\"505\" class=\"ninja_table_row_99 nt_row_id_505\">\n            <td>Kapsaos<\/td><td><\/td><td><\/td><td><\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>12,800,0\n 00<\/td><td>0<\/td><td>Pre procurement<\/td><td>Awaiting PIC report<\/td>        <\/tr>\n            <tr data-row_id=\"506\" class=\"ninja_table_row_100 nt_row_id_506\">\n            <td>Kapsaos<\/td><td><\/td><td>Provision of driving lessons to the Youth<\/td><td>To increase access to youth empowerment<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>27,135,6\n 10<\/td><td>0<\/td><td>Completed<\/td><td>The FY 23\/24 training program was done awaiting issuance of driving licenses<\/td>        <\/tr>\n            <tr data-row_id=\"507\" class=\"ninja_table_row_101 nt_row_id_507\">\n            <td>Kapsaos<\/td><td><\/td><td><\/td><td><\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>37,200,0\n 00<\/td><td>0<\/td><td>Pre procurement<\/td><td>Preparation of Terms of Reference was ongoing<\/td>        <\/tr>\n            <tr data-row_id=\"508\" class=\"ninja_table_row_102 nt_row_id_508\">\n            <td>Kapsaos<\/td><td>Purchase of seedlings<\/td><td>Purchase and issuing<\/td><td>To increase crop productivity<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>12,000,0\n 00<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project was at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"509\" class=\"ninja_table_row_103 nt_row_id_509\">\n            <td>Kapsaos<\/td><td>Inua Jamii Dorper program<\/td><td>Purchase and \n distribution of \n Dorper<\/td><td>To increase livestock production<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>11,200,0\n 00<\/td><td>0<\/td><td>Pre procurement<\/td><td>Project at design stage with contract framework<\/td>        <\/tr>\n            <tr data-row_id=\"510\" class=\"ninja_table_row_104 nt_row_id_510\">\n            <td>Kapsaos<\/td><td>Construction of St. James Pry Road Box \n Culvert<\/td><td>Drainage \n Improvement<\/td><td>Improve road and transport connectivity<\/td><td>-<\/td><td>-<\/td><td>5,500,00\n 0.00<\/td><td>0<\/td><td>Yet to start<\/td><td>Project handed over; however, it was yet to commence<\/td>        <\/tr>\n            <tr data-row_id=\"511\" class=\"ninja_table_row_105 nt_row_id_511\">\n            <td>Kapsaos<\/td><td>Purchase &amp; \n installation of streetlighting accessories<\/td><td>Installation of streetlights<\/td><td>To enhance access to clean and affordable energy<\/td><td>-<\/td><td>-<\/td><td>3,000,00\n 0<\/td><td>-<\/td><td>Completed<\/td><td>Project delivered<\/td>        <\/tr>\n            <tr data-row_id=\"512\" class=\"ninja_table_row_106 nt_row_id_512\">\n            <td>Kapsaos<\/td><td>30-Meter-High mast Flood \n Light<\/td><td>Installation of streetlights<\/td><td>To enhance access to clean and affordable energy<\/td><td>-<\/td><td>-<\/td><td>3,000,00\n 0<\/td><td>-<\/td><td>Yet to start<\/td><td>Project handed over; however, it was yet to kick off<\/td>        <\/tr>\n            <tr data-row_id=\"513\" class=\"ninja_table_row_107 nt_row_id_513\">\n            <td>Kapsaos<\/td><td>KapsaoskapkorosEmgoin Kapkeben \n Roads<\/td><td>Grading and \n Gravelling<\/td><td>Improve road and transport connectivity<\/td><td>-<\/td><td>-<\/td><td>4,000,00\n 0<\/td><td>-<\/td><td>Pre procurement<\/td><td>Project was at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"514\" class=\"ninja_table_row_108 nt_row_id_514\">\n            <td>Kapsaos<\/td><td>Construction of Box Culvert and Bridge<\/td><td>Drainage \n Improvement<\/td><td>Improve road and transport connectivity<\/td><td>-<\/td><td>-<\/td><td>6,000,00\n 0<\/td><td>-<\/td><td>Pre procurement<\/td><td>Project was at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"515\" class=\"ninja_table_row_109 nt_row_id_515\">\n            <td>Kapsaos<\/td><td>Kapsaos, \n Emkoin and Kapyemit roads<\/td><td>Drainage \n Improvement<\/td><td>Improve road and transport connectivity<\/td><td>-<\/td><td>-<\/td><td>2,000,00\n 0<\/td><td>-<\/td><td>Pre procurement<\/td><td>Project was at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"516\" class=\"ninja_table_row_110 nt_row_id_516\">\n            <td>Kapsaos<\/td><td>Fuel for \n Development works<\/td><td>Grading and \n Gravelling<\/td><td>Improve road and transport connectivity<\/td><td>-<\/td><td>-<\/td><td>2,000,00\n 0<\/td><td>-<\/td><td>Pre procurement<\/td><td>Project was at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"517\" class=\"ninja_table_row_111 nt_row_id_517\">\n            <td>Kapsaos<\/td><td>Road lighting of Kapsaos and Emkoin \n Pry school<\/td><td>Installation of streetlights<\/td><td>To enhance access to clean and affordable energy<\/td><td>-<\/td><td>-<\/td><td>3,975,11\n 3<\/td><td>-<\/td><td>Pre procurement<\/td><td>Project was at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"518\" class=\"ninja_table_row_112 nt_row_id_518\">\n            <td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"519\" class=\"ninja_table_row_113 nt_row_id_519\">\n            <td>Tapsagoi<\/td><td>Kaptebee \n Water Spring<\/td><td>Construction of storage tank, distribution, conservation of the environment<\/td><td>To increase access to portable water<\/td><td>July \n 2024<\/td><td>Dec \n 2024<\/td><td>3500000<\/td><td>3499692<\/td><td>Completed<\/td><td>Protection of the spring done and 5,000 ltrs plastic tank elevated; \n 100 assorted trees planted and 2.5KM distribution line completed; \n The project serves Kaptebee Sec. school and 3 other water points construction to serve the residence; \n Challenges: Water points not operational attributable to the low water yield; \n Way forward: Need to expand the spring and the samp; \n Need for additional distribution lines to reach more residence<\/td>        <\/tr>\n            <tr data-row_id=\"520\" class=\"ninja_table_row_114 nt_row_id_520\">\n            <td>Tapsagoi<\/td><td>Proposed construction of Turbo Level IV \n Hospital<\/td><td>Construction of main hospital block, laundry, kitchen, morgue &amp; \n incinerator<\/td><td>To improve access to quality medical care<\/td><td>May \n 2023<\/td><td>May \n 2025<\/td><td>705,710,330<\/td><td>111,051,893<\/td><td>Ongoing<\/td><td>The project was full contract with contractor not on site; \n Main structure (ground floor, 1st floor, 2nd floor and walling ongoing); \n Challenges: Inadequate resources had led to slowed construction works; Way forward: Need for additional budgetary allocation to hasten the completion of the project<\/td>        <\/tr>\n            <tr data-row_id=\"521\" class=\"ninja_table_row_115 nt_row_id_521\">\n            <td>Tapsagoi<\/td><td>Balunda Road<\/td><td>Grading, Gravelling Murrumming and drainage system<\/td><td>To improve road and transport infrastructure<\/td><td>Sept \n 2024<\/td><td>Oct \n 2024<\/td><td>-<\/td><td>-<\/td><td>Competed<\/td><td>A stretch of 1.3 KM was graded, gravelled &amp; murrums dumped; 4 lines of (600mm) culverts were installed;<\/td>        <\/tr>\n            <tr data-row_id=\"522\" class=\"ninja_table_row_116 nt_row_id_522\">\n            <td>Tapsagoi<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"523\" class=\"ninja_table_row_117 nt_row_id_523\">\n            <td>Tapsagoi<\/td><td>Chemenjo \u2013 \n Sosiani Roads<\/td><td>Grading, Gravelling Murrumming and drainage system<\/td><td>To improve road and transport infrastructure<\/td><td>Sept \n 2024<\/td><td>Oct \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>A stretch of 900M was graded, gravelled \n &amp; murrums put; \n 1 line of (600mm) culverts was installed; However, there was a need of foot bridge; \n The road links Sosiani village with \n Murgor and Chepkumia Primary schools respectively<\/td>        <\/tr>\n            <tr data-row_id=\"524\" class=\"ninja_table_row_118 nt_row_id_524\">\n            <td>Tapsagoi<\/td><td>Construction of Cluster 3 Ward Offices<\/td><td>Construction of Tapsagoi ward \n office<\/td><td>To create efficiency and effectiveness in public service<\/td><td>Feb \n 2022<\/td><td>June, \n 2023<\/td><td>-<\/td><td>-<\/td><td>Yet to start<\/td><td>Project yet to start occasioned by site identification<\/td>        <\/tr>\n            <tr data-row_id=\"525\" class=\"ninja_table_row_119 nt_row_id_525\">\n            <td>Tapsagoi<\/td><td>Karunda \n Water Project<\/td><td>Spring protection and distribution<\/td><td>To increase access to potable water<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>4,000,000<\/td><td>0<\/td><td>Procureme\n nt stage<\/td><td>Project was at the procurement level<\/td>        <\/tr>\n            <tr data-row_id=\"526\" class=\"ninja_table_row_120 nt_row_id_526\">\n            <td>Tapsagoi<\/td><td>Kapsowon dam<\/td><td>Drilling<\/td><td>To increase access to potable water<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>600,000<\/td><td>0<\/td><td>Yet to start<\/td><td>Project awaiting drilling<\/td>        <\/tr>\n            <tr data-row_id=\"527\" class=\"ninja_table_row_121 nt_row_id_527\">\n            <td>Tapsagoi<\/td><td>Tarus water project, \n Kamulat water project and<\/td><td>Construction &amp; distribution of water<\/td><td>To increase access to potable water and<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>15,000,000<\/td><td>0<\/td><td>Pre procureme\n nt<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"528\" class=\"ninja_table_row_122 nt_row_id_528\">\n            <td>Tapsagoi<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"529\" class=\"ninja_table_row_123 nt_row_id_529\">\n            <td>Tapsagoi<\/td><td>Chepkoilel water project<\/td><td><\/td><td>sanitation services<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"530\" class=\"ninja_table_row_124 nt_row_id_530\">\n            <td>Tapsagoi<\/td><td>Murgor water project<\/td><td>Construction &amp; distribution of water<\/td><td>To increase access to potable water<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>5,000,000<\/td><td>0<\/td><td>Pre procureme\n nt<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"531\" class=\"ninja_table_row_125 nt_row_id_531\">\n            <td>Tapsagoi<\/td><td>Tegeyiat KAG water project<\/td><td>Solarization &amp; \n Piping<\/td><td>To increase access to potable water<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>2,500,000<\/td><td>0<\/td><td>Pre procureme\n nt<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"532\" class=\"ninja_table_row_126 nt_row_id_532\">\n            <td>Tapsagoi<\/td><td>Turbo supply water project<\/td><td>Construction &amp; distribution of water<\/td><td>To increase access to potable water<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>1,000,000<\/td><td>0<\/td><td>Pre procureme\n nt<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"533\" class=\"ninja_table_row_127 nt_row_id_533\">\n            <td>Tapsagoi<\/td><td>Chepkoilel water project<\/td><td>Equipping and distribution<\/td><td>To increase access to potable water<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>2,875,113<\/td><td>0<\/td><td>Pre procureme\n nt<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"534\" class=\"ninja_table_row_128 nt_row_id_534\">\n            <td>Tapsagoi<\/td><td>Cheplaskei Tegeyiat water project<\/td><td>Equipping and distribution<\/td><td>To increase access to potable water<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>2,800,000<\/td><td>0<\/td><td>Pre procureme\n nt<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"535\" class=\"ninja_table_row_129 nt_row_id_535\">\n            <td>Tapsagoi<\/td><td>Emsos water project<\/td><td>Equipping and distribution<\/td><td>To increase access to potable water<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>2,000,000<\/td><td>0<\/td><td>Pre procureme\n nt<\/td><td>Project was at design Stage<\/td>        <\/tr>\n            <tr data-row_id=\"536\" class=\"ninja_table_row_130 nt_row_id_536\">\n            <td>Tapsagoi<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"537\" class=\"ninja_table_row_131 nt_row_id_537\">\n            <td>Tapsagoi<\/td><td>Tapsagoi crop diversification project<\/td><td>Provision of 6000 avocado and 41000 coffee trees seedlings<\/td><td>To enhance sustainable food production<\/td><td>July \n 2024<\/td><td>Dec \n 2024<\/td><td>5,000,000<\/td><td>5,000,000<\/td><td>Procureme\n nt stage<\/td><td>Project was at procurement state<\/td>        <\/tr>\n            <tr data-row_id=\"538\" class=\"ninja_table_row_132 nt_row_id_538\">\n            <td>Tapsagoi<\/td><td>Tapsagoi bee keeping project<\/td><td>Provision of 110 Langstroth bee \n hives<\/td><td>To enhance sustainable food production<\/td><td>July \n 2024<\/td><td>Dec \n 2024<\/td><td>1,000,000<\/td><td>1,000,000<\/td><td>Procureme\n nt stage<\/td><td>Project was at procurement state<\/td>        <\/tr>\n            <tr data-row_id=\"539\" class=\"ninja_table_row_133 nt_row_id_539\">\n            <td>Tapsagoi<\/td><td>Indigenous trees nurseries<\/td><td>Establishment of a 20,000-seedling tree nursery, capacity building and dissemination of tree seedlings<\/td><td>To enhance environment\n al \n conservation<\/td><td>July \n 2024<\/td><td>Dec \n 2024<\/td><td>1,500,000<\/td><td>1,500,000<\/td><td>Procureme\n nt stage<\/td><td>Project was at procurement state<\/td>        <\/tr>\n            <tr data-row_id=\"540\" class=\"ninja_table_row_134 nt_row_id_540\">\n            <td>Tapsagoi<\/td><td>Fencing of Kiptang springs<\/td><td>Surveying, demarcation and fencing<\/td><td>To enhance environment\n al \n conservation<\/td><td>July \n 2024<\/td><td>Dec \n 2024<\/td><td>1,000,000<\/td><td>1,000,000<\/td><td>Ongoing<\/td><td>Project was ongoing, with site cleared<\/td>        <\/tr>\n            <tr data-row_id=\"541\" class=\"ninja_table_row_135 nt_row_id_541\">\n            <td>Tapsagoi<\/td><td>Street lighting<\/td><td>Supply, installation and commissioning of 60 units of street lighting networks and 6 high masts<\/td><td>To increase access to \n electricity<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>48,000,000<\/td><td>48,000,000<\/td><td>Ongoing<\/td><td>Project completed with some wards awaiting metering<\/td>        <\/tr>\n            <tr data-row_id=\"542\" class=\"ninja_table_row_136 nt_row_id_542\">\n            <td>Tapsagoi<\/td><td>Kapkong \n ECDE<\/td><td>Construction of \n Classroom<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>800,000<\/td><td>0<\/td><td>Pre procureme\n nt<\/td><td>Requisition on process<\/td>        <\/tr>\n            <tr data-row_id=\"543\" class=\"ninja_table_row_137 nt_row_id_543\">\n            <td>Tapsagoi<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"544\" class=\"ninja_table_row_138 nt_row_id_544\">\n            <td>Tapsagoi<\/td><td>Kapreng \n ECDE<\/td><td>Construction of \n Classroom<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>500,000<\/td><td>0<\/td><td>Pre procureme\n nt<\/td><td>Requisition on process<\/td>        <\/tr>\n            <tr data-row_id=\"545\" class=\"ninja_table_row_139 nt_row_id_545\">\n            <td>Tapsagoi<\/td><td>Kenduiywo \n ECDE<\/td><td>Construction of \n Classroom<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>500,000<\/td><td>0<\/td><td>Pre procureme\n nt<\/td><td>Requisition on process<\/td>        <\/tr>\n            <tr data-row_id=\"546\" class=\"ninja_table_row_140 nt_row_id_546\">\n            <td>Tapsagoi<\/td><td>Kosachei \n ECDE<\/td><td>Construction of \n Classroom<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>500,000<\/td><td>0<\/td><td>Pre procureme\n nt<\/td><td>Requisition on process<\/td>        <\/tr>\n            <tr data-row_id=\"547\" class=\"ninja_table_row_141 nt_row_id_547\">\n            <td>Tapsagoi<\/td><td>Elgon Estate \n ECDE<\/td><td>Construction of \n Classroom<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>800,000<\/td><td>0<\/td><td>Pre procureme\n nt<\/td><td>Requisition on process<\/td>        <\/tr>\n            <tr data-row_id=\"548\" class=\"ninja_table_row_142 nt_row_id_548\">\n            <td>Tapsagoi<\/td><td>Holy rosary \n ECDE<\/td><td>Construction of \n Classroom<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>800,000<\/td><td>0<\/td><td>Pre procureme\n nt<\/td><td>Requisition on process<\/td>        <\/tr>\n            <tr data-row_id=\"549\" class=\"ninja_table_row_143 nt_row_id_549\">\n            <td>Tapsagoi<\/td><td>Tapsagoi \n ECDE<\/td><td>Construction of \n Classroom<\/td><td>Improve access to \n ECDE<\/td><td>Sept \n 2024<\/td><td>June \n 2025<\/td><td>500,000<\/td><td>0<\/td><td>Pre procureme\n nt<\/td><td>Requisition on process<\/td>        <\/tr>\n            <tr data-row_id=\"550\" class=\"ninja_table_row_144 nt_row_id_550\">\n            <td>Tapsagoi<\/td><td>Talent \n Development<\/td><td>Purchase of sports \n kits<\/td><td>To promote sports development<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>10,150,000<\/td><td>9,650,000<\/td><td>Completed<\/td><td>Sports kits purchased benefiting youths across the ward<\/td>        <\/tr>\n            <tr data-row_id=\"551\" class=\"ninja_table_row_145 nt_row_id_551\">\n            <td>Tapsagoi<\/td><td><\/td><td><\/td><td><\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>11,100,000<\/td><td>0<\/td><td>Yet to start<\/td><td>Awaiting PIC report<\/td>        <\/tr>\n            <tr data-row_id=\"552\" class=\"ninja_table_row_146 nt_row_id_552\">\n            <td>Tapsagoi<\/td><td>Youth \n Empowerment<\/td><td>Procuring and distribution of tools and equipment<\/td><td>To increase access to youth \n empowerme\n nt and<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>15,800,000<\/td><td>-<\/td><td>Completed<\/td><td>Tools and equipment purchased. Purchase worth 1,514,400 rolled over to the 2024\/25 FY across the county<\/td>        <\/tr>\n            <tr data-row_id=\"553\" class=\"ninja_table_row_147 nt_row_id_553\">\n            <td>Tapsagoi<\/td><td><\/td><td><\/td><td><\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>12,800,000<\/td><td>0<\/td><td>Yet to start<\/td><td>Awaiting PIC report<\/td>        <\/tr>\n            <tr data-row_id=\"554\" class=\"ninja_table_row_148 nt_row_id_554\">\n            <td>Tapsagoi<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"555\" class=\"ninja_table_row_149 nt_row_id_555\">\n            <td>Tapsagoi<\/td><td><\/td><td>Provision of driving lessons to the \n Youth<\/td><td>To increase access to youth \n empowerme\n nt<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>The FY 23\/24 training program was completed and awaiting issuance of driving licenses<\/td>        <\/tr>\n            <tr data-row_id=\"556\" class=\"ninja_table_row_150 nt_row_id_556\">\n            <td>Tapsagoi<\/td><td>Youth \n Empowerment<\/td><td>Provision of driving lessons to the \n Youth<\/td><td>To increase access to youth \n empowerme\n nt<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>37,200,000<\/td><td>-<\/td><td>Pre procureme\n nt<\/td><td>Preparation of Terms of Reference ongoing<\/td>        <\/tr>\n            <tr data-row_id=\"557\" class=\"ninja_table_row_151 nt_row_id_557\">\n            <td>Tapsagoi<\/td><td>Purchase of seedlings<\/td><td>Purchase and issuing<\/td><td>To increase crop productivity<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>12,000,000<\/td><td>0<\/td><td>Pre procureme\n nt<\/td><td>Requisitions to be done<\/td>        <\/tr>\n            <tr data-row_id=\"558\" class=\"ninja_table_row_152 nt_row_id_558\">\n            <td>Tapsagoi<\/td><td>Construction\/ Renovation of cattle dips<\/td><td>Rehabilitation of cattle dips<\/td><td>To increase livestock production<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>10,775,000<\/td><td>0<\/td><td>Yet to start<\/td><td>Transfer of fund<\/td>        <\/tr>\n            <tr data-row_id=\"559\" class=\"ninja_table_row_153 nt_row_id_559\">\n            <td>Tapsagoi<\/td><td>Inua mama na kuku (Improved Kienyeji chicken<\/td><td>Purchase and \n distribution of improved chicken breeds \n Conduct farmers' trainings \n Conduct M&amp;E<\/td><td>To increase livestock production<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>8,200,000<\/td><td>-<\/td><td>Yet to start<\/td><td>Tender awarded<\/td>        <\/tr>\n            <tr data-row_id=\"560\" class=\"ninja_table_row_154 nt_row_id_560\">\n            <td>Tapsagoi<\/td><td>Miti mbao, \n Chesumeidet - \n Manzini, \n Chepkendi - \n Kenduiwo,<\/td><td>Grading and \n Gravelling<\/td><td>Improve road and transport connectivity<\/td><td>-<\/td><td>-<\/td><td>2,651,159<\/td><td>-<\/td><td>Yet to start<\/td><td>Awaiting contractor<\/td>        <\/tr>\n            <tr data-row_id=\"561\" class=\"ninja_table_row_155 nt_row_id_561\">\n            <td>Tapsagoi<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"562\" class=\"ninja_table_row_156 nt_row_id_562\">\n            <td>Tapsagoi<\/td><td>Catholic - \n Joshua<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"563\" class=\"ninja_table_row_157 nt_row_id_563\">\n            <td>Tapsagoi<\/td><td>Balunda, \n Chemenjo - \n Sosiani, Turbo \n Town, \n Riverside, \n Besiobor - \n Tanui, \n Cheplaskei \n Roads<\/td><td>Grading and \n Gravelling<\/td><td>Improve road and transport connectivity<\/td><td>-<\/td><td>-<\/td><td>3,303,477<\/td><td>3,303,477<\/td><td>Completed<\/td><td>Grading and gravelling completed with a stretch of 2.8KM done; \n The road links Besiobor with Chemenjo and Sosiani areas<\/td>        <\/tr>\n            <tr data-row_id=\"564\" class=\"ninja_table_row_158 nt_row_id_564\">\n            <td>Tapsagoi<\/td><td>Kerebei, \n Kapkombich, \n Kapchief, \n Kapchemenjo, \n Kapraphael, \n Sugoi BEFA, \n Mark Tuigoin, \n Kapmoro-\n Julius, Julius, \n Manzini \n Primary, \n Chebwai, \n Chepkoilel, \n Tuiyobei II, \n Morto Roads<\/td><td>Drainage \n Improvement<\/td><td>Improve road and transport connectivity<\/td><td>-<\/td><td>-<\/td><td>3,500,000<\/td><td>-<\/td><td>Yet to start<\/td><td>Handed over, however, the construction works was yet to start<\/td>        <\/tr>\n            <tr data-row_id=\"565\" class=\"ninja_table_row_159 nt_row_id_565\">\n            <td>Tapsagoi<\/td><td>Construction of Kenduiywo -<\/td><td>Drainage \n Improvement<\/td><td>Improve road and<\/td><td>-<\/td><td>-<\/td><td>4,900,000.00<\/td><td>-<\/td><td>Yet to start<\/td><td>Handed over; \n Project yet to start<\/td>        <\/tr>\n            <tr data-row_id=\"566\" class=\"ninja_table_row_160 nt_row_id_566\">\n            <td>Tapsagoi<\/td><td>Jeremiah Box \n Culvert in<\/td><td><\/td><td>transport connectivity<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"567\" class=\"ninja_table_row_161 nt_row_id_567\">\n            <td>Tapsagoi<\/td><td>Streetlights at \n Murgor hills, Tiret level 4 road, Cheplaskei, \n Chepkoiyo, \n Daraja mbili, Kosachei B centres<\/td><td>Installation of streetlights<\/td><td>To enhance access to clean and affordable energy<\/td><td>-<\/td><td>-<\/td><td>2,000,000.00<\/td><td>-<\/td><td>Ongoing<\/td><td>Project was ongoing with some wards completed awaiting to be metered<\/td>        <\/tr>\n            <tr data-row_id=\"568\" class=\"ninja_table_row_162 nt_row_id_568\">\n            <td>Tapsagoi<\/td><td>Sections of roads across the ward<\/td><td>Grading, graveling and Murrumming<\/td><td>Improve road and transport connectivity<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>-<\/td><td>-<\/td><td>Pre procureme\n nt<\/td><td>Project at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"569\" class=\"ninja_table_row_163 nt_row_id_569\">\n            <td>Tapsagoi<\/td><td>Purchase of \n Specialized Plant. -Asphalt production plant<\/td><td>Construction and equipping of asphalt production plant<\/td><td>Improve road and transport connectivity<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>70,000,000<\/td><td>-<\/td><td>Procureme\n nt<\/td><td>Project was at procurement level<\/td>        <\/tr>\n            <tr data-row_id=\"570\" class=\"ninja_table_row_164 nt_row_id_570\">\n            <td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"571\" class=\"ninja_table_row_165 nt_row_id_571\">\n            <td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"572\" class=\"ninja_table_row_166 nt_row_id_572\">\n            <td>Huruma<\/td><td>Kahoya \u2013 Miti Moja main road<\/td><td>Grading, Gravelling and Murrumming<\/td><td>To improve road and transport infrastructure<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>The project was done in the FY 2023\/24 with a stretch of 3.7KM graded, gravelled and murrum dumped; \n The road links Main Huruma with \n Kahoya &amp; its environs<\/td>        <\/tr>\n            <tr data-row_id=\"573\" class=\"ninja_table_row_167 nt_row_id_573\">\n            <td>Huruma<\/td><td>Kahoya connecting Albertos<\/td><td>Opening of the road, grading<\/td><td>To enhance access to clean and affordable energy<\/td><td>July \n 2024<\/td><td>June \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>A stretch of 1KM was opened and graded; \n The road served the Kahoya \u2013 Albertos residence and its environs<\/td>        <\/tr>\n            <tr data-row_id=\"574\" class=\"ninja_table_row_168 nt_row_id_574\">\n            <td>Huruma<\/td><td>Hill side road \u2013 \n Marathana; \n Matokeo road \n \u2013 Kahoya Mix; \n Kwa Chief \u2013 \n Kahoya Mix<\/td><td>Grading, Gravelling and Murrumming<\/td><td>To improve road and transport infrastructure<\/td><td>July \n 2024<\/td><td>-<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>A total of 3.5KM of assorted road sections were graded, gravelled and murrums dumped<\/td>        <\/tr>\n            <tr data-row_id=\"575\" class=\"ninja_table_row_169 nt_row_id_575\">\n            <td>Huruma<\/td><td>Extension of sewer lines<\/td><td>Construction of man holes and sewer lines<\/td><td>To promote public health<\/td><td>Jan \n 2024<\/td><td>March \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>The extension of sewer lines was done in 3 phases; \n Phase I was Kambi Mawe \u2013 Kwa Loi with a stretch of 700M done and serving an average of 120HH; Phase II was Matokeo road with a stretch of 1KM completed and serving an average of 300HH while Phase III was Jesus Winner with a stretch of 500M serving 320HH<\/td>        <\/tr>\n            <tr data-row_id=\"576\" class=\"ninja_table_row_170 nt_row_id_576\">\n            <td>Huruma<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"577\" class=\"ninja_table_row_171 nt_row_id_577\">\n            <td>Huruma<\/td><td>St. Grabriel \n Kingongo \n ECDE<\/td><td>Construction of perimeter wall<\/td><td>To enhance access to quality ECDE<\/td><td>Jan \n 2024<\/td><td>March \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>Construction of the perimeter wall, installation of razor wire and a gate done; \n The ECDE was a feeder school to Huruma Pri. with a population of 110 pupils and a transition rate of 100 percent attributable to the school feeding program; \n Challenges: lack of playground, ECDE toilets, inadequate teaching and learning materials \n Way forward: Need for additional budgetary allocation for acquisition of playground, construction of ablution block among others<\/td>        <\/tr>\n            <tr data-row_id=\"578\" class=\"ninja_table_row_172 nt_row_id_578\">\n            <td>Huruma<\/td><td>Kingongo \u2013 \n Kamanda \n Road<\/td><td>Grading and \n Murrumming<\/td><td>To improve road and transport infrastructure<\/td><td>Nov. \n 2024<\/td><td>Dec. \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>A stretch of 2KM was graded and murrums put; \n The road links Kingongo with Kipkenyo \n Ward<\/td>        <\/tr>\n            <tr data-row_id=\"579\" class=\"ninja_table_row_173 nt_row_id_579\">\n            <td>Huruma<\/td><td>Streetlighting<\/td><td>Installation\/ repair of streetlights<\/td><td>To enhance access to clean &amp; affordable energy<\/td><td>Nov \n 2024<\/td><td>Dec 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>A total of 44 streetlights were installed with nonfunctional bulbs replaced in some sections<\/td>        <\/tr>\n            <tr data-row_id=\"580\" class=\"ninja_table_row_174 nt_row_id_580\">\n            <td>Huruma<\/td><td>Big 5 road<\/td><td>Grading, stone patching, drainage works<\/td><td>To improve road and transport infrastructure<\/td><td>Nov. \n 2024<\/td><td>Dec 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>A stretch of 1.5KM was graded and 7 lines of culverts (600mm) installed<\/td>        <\/tr>\n            <tr data-row_id=\"581\" class=\"ninja_table_row_175 nt_row_id_581\">\n            <td>Huruma<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"582\" class=\"ninja_table_row_176 nt_row_id_582\">\n            <td>Huruma<\/td><td>Mwenderi \n ECDE<\/td><td>Construction of kitchen, gate and fencing<\/td><td>To enhance access to quality ECDE<\/td><td>Jan \n 2024<\/td><td>March \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>The project was done in the FY 2023\/24 with 1 kitchen, gate and fencing completed; \n The centre had a population of 120 pupils and recorded a 100 percent transition rate attributable to the school feeding program; \n Challenges: inadequate teaching and learning materials, lack of playfield and toilets \n Way forward: Need for additional budgetary allocation for acquisition of playground and construction of ablution block<\/td>        <\/tr>\n            <tr data-row_id=\"583\" class=\"ninja_table_row_177 nt_row_id_583\">\n            <td>Huruma<\/td><td>Huruma Ward \n Office<\/td><td>Construction of the ward office<\/td><td>To enhance access to public service<\/td><td><\/td><td><\/td><td>-<\/td><td>-<\/td><td>Stalled<\/td><td>The project was a full contract with the main structure constructed and roofed, fencing completed and sentry box done; \n Remaining works: ceiling, painting, civil works among other finishing works Challenges: inadequate funding compounded by delayed release of project funds; \n Way forward: need for adequate budgetary allocation and prompt release of funds<\/td>        <\/tr>\n            <tr data-row_id=\"584\" class=\"ninja_table_row_178 nt_row_id_584\">\n            <td>Huruma<\/td><td>Shauri ECDE<\/td><td>Construction of classroom<\/td><td>To enhance access to quality ECDE<\/td><td>Jan \n 2024<\/td><td>April \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>Project was done in the FY 2023\/24 with construction of 1 classroom completed and in use;<\/td>        <\/tr>\n            <tr data-row_id=\"585\" class=\"ninja_table_row_179 nt_row_id_585\">\n            <td>Huruma<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"586\" class=\"ninja_table_row_180 nt_row_id_586\">\n            <td>Huruma<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td>The centre had a population of 150 pupils and recorded a 100 percent transition rate attributable to the school feeding program; \n Challenges: lack of playground, inadequate teaching and learning materials \n Way forward: need for adequate budgetary allocation for acquisition of a playground<\/td>        <\/tr>\n            <tr data-row_id=\"587\" class=\"ninja_table_row_181 nt_row_id_587\">\n            <td>Huruma<\/td><td>High Mast \n Light<\/td><td>Installation of a high mast light<\/td><td>To enhance 24-hour economy<\/td><td>Aug. \n 2023<\/td><td>Sept. \n 2023<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>Installation of the high mast light done; It serves the larger Shauri estate and its environs<\/td>        <\/tr>\n            <tr data-row_id=\"588\" class=\"ninja_table_row_182 nt_row_id_588\">\n            <td>Huruma<\/td><td>Huruma bee keeping<\/td><td>Provision of \n 110 Langstroth bee hives<\/td><td>To enhance sustainable food production<\/td><td>July \n 2024<\/td><td>Dec 2024<\/td><td>1,000,000<\/td><td>1,000,000<\/td><td>Procurement stage<\/td><td>Project was at procurement level<\/td>        <\/tr>\n            <tr data-row_id=\"589\" class=\"ninja_table_row_183 nt_row_id_589\">\n            <td>Huruma<\/td><td>Kandie Primary Rain water harvesting<\/td><td>Rain water harvesting system with 50M\u00b3 underground sump &amp; solar power pump<\/td><td>To increase access to potable water<\/td><td>July \n 2024<\/td><td>Dec 2024<\/td><td>3,000,000<\/td><td>-<\/td><td>Procurement stage<\/td><td>Project was at procurement level<\/td>        <\/tr>\n            <tr data-row_id=\"590\" class=\"ninja_table_row_184 nt_row_id_590\">\n            <td>Huruma<\/td><td>Boda Boda \n Shades at \n West Indies, Spain, Chicago and Kokwas<\/td><td>Construction of Boda Boda shades<\/td><td>Improve road and transport connectivity<\/td><td>-<\/td><td>-<\/td><td>1,000,000.00<\/td><td>-<\/td><td>Procurement stage<\/td><td>Project was at procurement level<\/td>        <\/tr>\n            <tr data-row_id=\"591\" class=\"ninja_table_row_185 nt_row_id_591\">\n            <td>Huruma<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"592\" class=\"ninja_table_row_186 nt_row_id_592\">\n            <td>Huruma<\/td><td>Hire of construction equipment in various Roads<\/td><td>Grading and \n Gravelling<\/td><td>Improve road and transport connectivity<\/td><td>-<\/td><td>-<\/td><td>3,000,000.00<\/td><td><\/td><td>Pre procurement<\/td><td>The project was at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"593\" class=\"ninja_table_row_187 nt_row_id_593\">\n            <td>Huruma<\/td><td>Culverts Gatanga, \n Kokwas and \n Big 5-\n Mwenderi<\/td><td>Drainage \n Improvement<\/td><td>Improve road and transport connectivity<\/td><td>-<\/td><td>-<\/td><td>3,000,000.00<\/td><td><\/td><td>Pre procurement<\/td><td>The project was at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"594\" class=\"ninja_table_row_188 nt_row_id_594\">\n            <td>Huruma<\/td><td>Spot Patching-\n Kokwas<\/td><td>Grading and \n Gravelling<\/td><td>Improve road and transport connectivity<\/td><td>-<\/td><td>-<\/td><td>3,475,113.00<\/td><td><\/td><td>Pre procurement<\/td><td>The project was at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"595\" class=\"ninja_table_row_189 nt_row_id_595\">\n            <td>Huruma<\/td><td>Spot Patching- \n Redgate<\/td><td>Grading and \n Gravelling<\/td><td>Improve road and transport connectivity<\/td><td>-<\/td><td>-<\/td><td>2,000,000.00<\/td><td><\/td><td>Pre procurement<\/td><td>The project was at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"596\" class=\"ninja_table_row_190 nt_row_id_596\">\n            <td>Huruma<\/td><td>Boda boda shades at \n Huruma \n Hospital, \n Kokwas &amp; \n Kambi mawe<\/td><td>Construction of Boda Boda shades<\/td><td>Improve road and transport connectivity<\/td><td>-<\/td><td>-<\/td><td>1,000,000.00<\/td><td><\/td><td>Pre procurement<\/td><td>The project was at design stage<\/td>        <\/tr>\n            <tr data-row_id=\"597\" class=\"ninja_table_row_191 nt_row_id_597\">\n            <td>Huruma<\/td><td>Talent \n Development<\/td><td>Purchase of sports kits<\/td><td>To promote sports development<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>Sports kits purchased and distributed to teams across the ward<\/td>        <\/tr>\n            <tr data-row_id=\"598\" class=\"ninja_table_row_192 nt_row_id_598\">\n            <td>Huruma<\/td><td><\/td><td><\/td><td><\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>11,100,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Awaiting PIC report<\/td>        <\/tr>\n            <tr data-row_id=\"599\" class=\"ninja_table_row_193 nt_row_id_599\">\n            <td>Huruma<\/td><td>Youth \n Empowerment<\/td><td>Procuring and \n distribution<\/td><td>To increase access to<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>Tools and equipment purchased and distributed to youths and groups across the ward<\/td>        <\/tr>\n            <tr data-row_id=\"600\" class=\"ninja_table_row_194 nt_row_id_600\">\n            <td>Huruma<\/td><td><\/td><td>of tools and equipment<\/td><td>youth empowerment<\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"601\" class=\"ninja_table_row_195 nt_row_id_601\">\n            <td>Huruma<\/td><td><\/td><td><\/td><td><\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>12,800,000<\/td><td>0<\/td><td>Pre procurement<\/td><td>Awaiting PIC report<\/td>        <\/tr>\n            <tr data-row_id=\"602\" class=\"ninja_table_row_196 nt_row_id_602\">\n            <td>Huruma<\/td><td>Youth \n Empowerment<\/td><td>Provision of driving lessons to the Youth<\/td><td>To increase access to youth empowerment<\/td><td>July \n 2023<\/td><td>June \n 2024<\/td><td>27,135,610<\/td><td>-<\/td><td>Completed<\/td><td>The FY 23\/24 training program was completed and awaiting issuance of driving licenses<\/td>        <\/tr>\n            <tr data-row_id=\"603\" class=\"ninja_table_row_197 nt_row_id_603\">\n            <td><\/td><td><\/td><td><\/td><td><\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>37,200,000<\/td><td>-<\/td><td>Ongoing<\/td><td>Preparation of Terms of Reference ongoing.<\/td>        <\/tr>\n            <tr data-row_id=\"604\" class=\"ninja_table_row_198 nt_row_id_604\">\n            <td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td><td><\/td>        <\/tr>\n            <tr data-row_id=\"605\" class=\"ninja_table_row_199 nt_row_id_605\">\n            <td>Kiplombe<\/td><td>Installation of solar lighting at Kabooi, Kaplelach, Tanzania, Kapchumba -Kotut, \n Jerusalem, Emgwen, \n Chebarus centres<\/td><td>Installation of streetlights<\/td><td>To enhance access to clean and affordable energy<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>4,828,612.\n 00<\/td><td>-<\/td><td>Completed<\/td><td>34 solar street lightings installed around Kabooi, Kaplelach, \n Tanzania, Kapchumba - Kotut, Jerusalem, Emgwen and Chebarus centres<\/td>        <\/tr>\n            <tr data-row_id=\"606\" class=\"ninja_table_row_200 nt_row_id_606\">\n            <td>Kiplombe<\/td><td>Buemba \/ Kolongei<\/td><td>Distribution<\/td><td>To increase access to potable water<\/td><td>July \n 2022<\/td><td>June \n 2023<\/td><td>-<\/td><td>-<\/td><td>Completed<\/td><td>Installed water point at Kolongei Pry \n School<\/td>        <\/tr>\n            <tr data-row_id=\"607\" class=\"ninja_table_row_201 nt_row_id_607\">\n            <td>Kiplombe<\/td><td>Upgrading of 64 \n Stadium in City of \n Eldoret<\/td><td>Upgrading<\/td><td>To promote sports development<\/td><td>April \n 2021<\/td><td>Marc\n h \n 2024<\/td><td>1,163,563,\n 925<\/td><td>618,858,604<\/td><td>Ongoing<\/td><td>Ongoing<\/td>        <\/tr>\n            <tr data-row_id=\"608\" class=\"ninja_table_row_202 nt_row_id_608\">\n            <td>Kiplombe<\/td><td>Grading and graveling \n Kiplombe location, \n Emkwen sub-location, Kolongei - Kaplelach roads<\/td><td>Grading and \n Gravelling<\/td><td>Improve road and transport connectivity<\/td><td>July \n 2024<\/td><td>June \n 2025<\/td><td>10,000,00<\/td><td>-<\/td><td>Ongoing<\/td><td>Approx. 5KM along Kiplombe- \n Tebeson road done<\/td>        <\/tr>\n    <\/tbody><!--ninja_tobody_rendering_done-->\n    <\/table>\n    \n    \n    \n<\/div>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"","protected":false},"author":8,"featured_media":0,"parent":13790,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"tpl-default-elementor.php","meta":{"footnotes":""},"class_list":["post-13815","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/pages\/13815","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/comments?post=13815"}],"version-history":[{"count":4,"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/pages\/13815\/revisions"}],"predecessor-version":[{"id":13831,"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/pages\/13815\/revisions\/13831"}],"up":[{"embeddable":true,"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/pages\/13790"}],"wp:attachment":[{"href":"https:\/\/uasingishu.go.ke\/index.php\/wp-json\/wp\/v2\/media?parent=13815"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}